Archive · Week of Sep 28–Oct 4, 2026 · Kitchen Equipment

Austin Kitchen Equipment Permit Leads: Sep 28–Oct 4, 2026

From Monday, Sep 28 through Sunday, Oct 4, 2026, 45 commercial projects entered or moved through City of Austin plan review and 58 commercial building permits were issued. 4 plan review cases and 3 issued permits rate Strong or Medium for Kitchen Equipment work.

This archived issue is ranked for Kitchen Equipment work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Oct 2.

Austin Permit Leads · Weekly Digest

Week of Sep 28–Oct 4, 2026

45 commercial projects in city plan review and 58 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 43 of the issued permits were previously in plan review and are marked, so nothing shows up twice.

In Plan Review: Week of Sep 28–Oct 4

Issued Permits: Week of Sep 28–Oct 4

1. Restaurant remodel

Moved to Awaiting Update - Fee Paid Sep 30
Remodel · applied Aug 3 · Awaiting Update - Fee Paid · 3,000 SF · $150K est. (TDLR filing)
Kitchen Equipment: Medium fit · score 61

First Time Finish out for Restaurant (3,000 SF)

Architect/Engineer: Professional StruCIVIL Engineers, Inc (from 2024 site plan SP-2024-0265C)
View on City of Austin AB+C Portal

2. Restaurant remodel

New this week (applied Sep 30)
Remodel · applied Sep 30 · Awaiting Update · 4,400 SF
Kitchen Equipment: Medium fit · score 61

Interior demolition of existing 4,400 SF restaurant and bar to a cold dark shell: non-load bearing partitions, finishes, casework, bar, bandstand, non-original…

GC or design-builder: CSW Construction Services LTD
View on City of Austin AB+C Portal

3. Warehouse remodel

Moved to Awaiting Update Sep 28
Remodel · applied Sep 11 · Awaiting Update · $325K est. (TDLR filing)
Kitchen Equipment: Medium fit · score 55

Tenant finish-out of an existing shell building for food distribution. (Building 2)

Architect/Engineer: Link Architecture
View on City of Austin AB+C Portal

4. Change of use to restaurant

New this week (applied Sep 30)
Remodel · applied Sep 30 · Awaiting Update · $100K est. (TDLR filing)
Kitchen Equipment: Medium fit · score 55

Interior remodel and Change of Use from retail to create restaurant. Add rear landing at door and add exterior grease trap

Architect/Engineer: MAD Architecture
View on City of Austin AB+C Portal

5. Retail building

Moved to In Review Oct 1
New · applied Aug 17 · In Review · 3,340 SF · $275K
Kitchen Equipment: Low fit · score 31

New Construction for Cantina for COTAland. TBP created for BP and PP 2026-129590 JWE 10/01/2026

Owner/Developer: Circuit of the Americas LLC
Permit expediter: Aus-Tex Building Consultants
View on City of Austin AB+C Portal

1. Restaurant remodel

Permit issued Oct 1
Remodel · 12,213 SF · $350K est. (TDLR filing) · issued Oct 1
Kitchen Equipment: Strong fit · score 75

Interior Remodel - Game Testing Coffee Bar and Game Observation Room. Interior Remodel - The Unisex Restroom will remain available while the Men & Ladies Room are under construction. Once they are completed the Unisex Restroom will be remodeled. Interior…

GC or design-builder: Harvey-Cleary Builders
View on City of Austin AB+C Portal

2. Change of use to restaurant

Permit issued Sep 30
Remodel · 990 SF · issued Sep 30
Kitchen Equipment: Medium fit · score 55

Change of use to Indoor Sports and Recreation (Computer Cafe)

GC or design-builder: Wehbe Properties
View on City of Austin AB+C Portal

3. Change of use to restaurant

Permit issued Sep 30
Remodel · 668 SF · issued Sep 30
Kitchen Equipment: Medium fit · score 55

CHANGE OF USE RETAIL TO RESTAURANT will be a small primarily grab and go QSR see operations document attached for more detailed information

GC or design-builder: Csb Construction LLC
View on City of Austin AB+C Portal

4. Hospital

Permit issued Oct 2
New · issued Oct 2
Kitchen Equipment: Low fit · score 39

2026/10/02 - 2026/10/04 - Weekend 1| 2026/10/09 - 2026/10/11 - Weekend 2 | (2026/09/14) | Music stages food vendors art vendors & hospitality programs. October 2-4 & 9-11 2026 in Zilker Park.

No company contact in the City data.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.

5. Manufacturing plant shell

Permit issued Sep 29
Shell · $100M est. (TDLR filing) · issued Sep 29
Kitchen Equipment: Low fit · score 39

TEMPORARY BUILDING PERMIT - Scope is limited to structural foundations for the Factory building for Project Toaster including piles grade beams stem walls concrete floor slabs and associated reinforcing bar.

GC or design-builder: The Whiting-Turner Contracting Company
View on City of Austin AB+C Portal

+40 more plan review cases in the full issue

+53 more issued permits in the full issue

How fit is scored for kitchen and food-service equipment work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit food-service wording (kitchen, restaurant, cafe, bar, hood, walk-in cooler). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.

Showing the top leads in each section for the week of Sep 28–Oct 4, 2026.

Start Your Free Trial
Austin Permit Leads · Daily Recap

Friday, Oct 2, 2026

8 commercial projects in city plan review and 11 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 8 of the issued permits were previously in plan review and are marked, so nothing shows up twice.

In Plan Review: Fri, Oct 2

Issued Permits: Fri, Oct 2

1. Industrial building

New today (applied Oct 2)
New · applied Oct 2 · Awaiting Update · 27,200 SF · $4.7M
Kitchen Equipment: Low fit · score 28

Ground up construction of a 27,200 SF industrial building with (2) 1,080 SF speculative offices

GC or design-builder: ARCO Murray
View on City of Austin AB+C Portal

2. Commercial remodel

New today (applied Oct 2)
Remodel · applied Oct 2 · Approved as of Oct 29, 2026 · 4,325 SF · $500K est. (TDLR filing)
Kitchen Equipment: Low fit · score 6

4325 SF Commercial Lease Space Build-Out for Nail Salon

Owner/Developer: RH Pioneer North LLC (from site plan SP-2019-0584C(R1))
View on City of Austin AB+C Portal

3. Commercial remodel

New today (applied Oct 2)
Remodel · applied Oct 2 · In Review · $2M est. (TDLR filing)
Kitchen Equipment: Low fit · score 0

First time finish out to create Spec Suite

Owner/Developer: 3724 Acquisitions LLC
Permit expediter: Mercury Permits Inc
View on City of Austin AB+C Portal

4. Commercial remodel

New today (applied Oct 2)
Remodel · applied Oct 2 · Approved as of Oct 21, 2026 · $780K est. (TDLR filing)
Kitchen Equipment: Low fit · score 0

First generation construction of new common corridor on Level 4 (small project review)

Owner/Developer: 3423 Holdings LLC (from 2020 site plan SP-2020-0143C.F2)
View on City of Austin AB+C Portal

5. Commercial remodel

New today (applied Oct 2)
Remodel · applied Oct 2 · In Review · 1,786 SF
Kitchen Equipment: Low fit · score 0

Approx. 1786 sf of interior finish updates, no change of use, existing tenant. Existing pet services

No company contact in the City data.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.

1. Hospital

Permit issued Oct 2
New · issued Oct 2
Kitchen Equipment: Low fit · score 39

2026/10/02 - 2026/10/04 - Weekend 1| 2026/10/09 - 2026/10/11 - Weekend 2 | (2026/09/14) | Music stages food vendors art vendors & hospitality programs. October 2-4 & 9-11 2026 in Zilker Park.

No company contact in the City data.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.

2. Commercial remodel

Permit issued Oct 2
Remodel · 9,366 SF · $2.1M est. (TDLR filing) · issued Oct 2
Kitchen Equipment: Low fit · score 12

Phase 2 Interior Remodel to Existing Floor 1 of Building 1. Phase 3 Interior Remodel to Existing Floor 1of Building 2. Phase 4 Interior Remodel to Existing Floor 2 of Building 2.

GC or design-builder: Sabre Commercial, Inc
View on City of Austin AB+C Portal

4. Telecom site

Permit issued Oct 2
New · $38K · issued Oct 2
Kitchen Equipment: Low fit · score 0

Verizon installing antennas lines cables and microwave dishes on the existing cell tower. No changes to the tower height.

GC or design-builder: Kinetics Plus LLC
View on City of Austin AB+C Portal

5. Commercial remodel

Permit issued Oct 2
Remodel · 1,400 SF · $1.3M est. (TDLR filing) · issued Oct 2
Kitchen Equipment: Low fit · score 0

100 kva ups (Uninterpretable Power Supply) sub-panels and receptacles.

GC or design-builder: CPG Beyond the Cloud
View on City of Austin AB+C Portal

+3 more plan review cases in the full issue

+6 more issued permits in the full issue

How fit is scored for kitchen and food-service equipment work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit food-service wording (kitchen, restaurant, cafe, bar, hood, walk-in cooler). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.

Showing the top leads in each section for Friday, Oct 2, 2026.

Start Your Free Trial

Daily Recap Spreadsheet Preview

Daily Recap Feature
Plan Review or Issued PermitAddress / ProjectWorkValuationCompanyFit (Kitchen Equipment)
Plan ReviewIndustrial buildingNew$4.7MARCO MurrayLow
Plan ReviewCommercial remodelRemodel$500K est. (TDLR filing)RH Pioneer North LLCLow
Plan ReviewCommercial remodelRemodel$2M est. (TDLR filing)3724 Acquisitions LLCLow
Plan ReviewCommercial remodelRemodel$780K est. (TDLR filing)3423 Holdings LLCLow
Plan ReviewCommercial remodelRemodelN/AN/ALow
Issued PermitHospitalNewN/AN/ALow

A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.

← Previous WeekAll WeeksNext Week →

Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.