1. Industrial building
Ground up construction of a 27,200 SF industrial building with (2) 1,080 SF speculative offices
From Monday, Sep 28 through Sunday, Oct 4, 2026, 45 commercial projects entered or moved through City of Austin plan review and 58 commercial building permits were issued. 3 plan review cases and 10 issued permits rate Strong or Medium for Electrical work.
This archived issue is ranked for Electrical work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Oct 2.
45 commercial projects in city plan review and 58 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 43 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Ground up construction of a 27,200 SF industrial building with (2) 1,080 SF speculative offices
Install (4) Level 2 EV chargers in an existing multi-family R2 complex
BAUS Review- Interior Remodel to Install Wall frame, Scope of Work Will Also Include Electrical Assemblies (660,000 SF)
Installation of 48.79kw pv solar system
This is an abandoned system. There is an existing 4.860KW roof mounted system onsite and (1) 10KW Franklin Battery. We will be requesting a pre-inspection and actively…
New Construction of Shell Affordable Housing Units. New Construction of Parking Garage. First Time Finish Out for Phase 1 Multi Family Club and Amenity. First Time Finish Out for Phase 2 Multi Family Building. First Time Finish Out for Phase 3 Multi Family…
Tenant interior renovation of an existing Dialysis clinic. Work includes updating finishes plumbing mechanical electrical and the addition of a wall to the reception area
New Construction of Parking Garage (60527 SF). New Shell of 7 Story Multi Family Building (113387 SF). First Time Finish Out for Floor 1 (8002 SF). First Time Finish Out for Floor 2 (20610 SF). First Time Finish Out for Floor 3 (16955 SF). First Time Finish…
Addition and Remodel to Existing Exterior Hospital Services. Work to include replacing existing Generator and Fuel Tank. Electrical scope is split into 7 distinct phases to maintain emergency power to the hospital. Fenced main switch board (89 SF) remodeled…
interior remodel to existing office space
+40 more plan review cases in the full issue
+53 more issued permits in the full issue
How fit is scored for electrical work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (labs, data, medical, hotels, grocery and industrial carry the most electrical load) and explicit electrical wording (service upgrade, switchgear, transformer, generator, EV charging, lighting, solar). Strong needs real size (20,000+ SF) or explicit electrical scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Sep 28–Oct 4, 2026.
Start Your Free Trial8 commercial projects in city plan review and 11 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 8 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Ground up construction of a 27,200 SF industrial building with (2) 1,080 SF speculative offices
4325 SF Commercial Lease Space Build-Out for Nail Salon
First time finish out to create Spec Suite
Approx. 1786 sf of interior finish updates, no change of use, existing tenant. Existing pet services
Phase 2 - Build out of business lab in existing tenant space. No access control. No Hazmat component to this phase. No plumbing scope in this phase. No exterior work or…
100 kva ups (Uninterpretable Power Supply) sub-panels and receptacles.
7 DAY - INTERIORE REMODEL TO EXISTING OFFICE SUITE WITH MEP SCOPE. NO ACCESS CONTROL. JBOX ROUGH IN ONLY FUTURE TENANT WILL APPLY FOR ACCESS CONTROL. - OVA
Central UPS (Uninterruptible Power Supply) Systems Upgrade (Server rooms IDF MDF) UPS replacements. Installations of new UPSs sub-panels and receptacles for Bldg. B100 Central UPS (Uninterruptible Power Supply) Systems Upgrade (Server rooms IDF MDF) UPS…
2026/10/02 - 2026/10/04 - Weekend 1| 2026/10/09 - 2026/10/11 - Weekend 2 | (2026/09/14) | Music stages food vendors art vendors & hospitality programs. October 2-4 & 9-11 2026 in Zilker Park.
2026/10/02 - 2026/10/03 | day mobile gym pop-up activation featuring gym workouts music and limited F&B
+3 more plan review cases in the full issue
+6 more issued permits in the full issue
How fit is scored for electrical work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (labs, data, medical, hotels, grocery and industrial carry the most electrical load) and explicit electrical wording (service upgrade, switchgear, transformer, generator, EV charging, lighting, solar). Strong needs real size (20,000+ SF) or explicit electrical scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Oct 2, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Electrical) |
|---|---|---|---|---|---|
| Plan Review | Industrial building | New | $4.7M | ARCO Murray | Medium |
| Plan Review | Commercial remodel | Remodel | $500K est. (TDLR filing) | RH Pioneer North LLC | Low |
| Plan Review | Commercial remodel | Remodel | $2M est. (TDLR filing) | 3724 Acquisitions LLC | Low |
| Plan Review | Commercial remodel | Remodel | N/A | N/A | Low |
| Plan Review | Lab remodel | Remodel | N/A | Karlin McCallen Pass LLC | Low |
| Issued Permit | Commercial remodel | Remodel | $1.3M est. (TDLR filing) | CPG Beyond the Cloud | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.