1. Restaurant remodel
Interior demolition of existing 4,400 SF restaurant and bar to a cold dark shell: non-load bearing partitions, finishes, casework, bar, bandstand, non-original…
From Monday, Sep 28 through Sunday, Oct 4, 2026, 45 commercial projects entered or moved through City of Austin plan review and 58 commercial building permits were issued. 7 plan review cases and 21 issued permits rate Strong or Medium for Drywall / Framing work.
This archived issue is ranked for Drywall / Framing work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Oct 2.
45 commercial projects in city plan review and 58 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 43 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior demolition of existing 4,400 SF restaurant and bar to a cold dark shell: non-load bearing partitions, finishes, casework, bar, bandstand, non-original…
Ground up construction of a 27,200 SF industrial building with (2) 1,080 SF speculative offices
Install 5/8 drywall through out the ceiling. (App 1 - Suite 151). (App 2 - Suite 152)
Non structural demolition, drywall partitions, lighting, circuit relocation, carpet patch and paint
New Construction for Cantina for COTAland. TBP created for BP and PP 2026-129590 JWE 10/01/2026
New Construction of Parking Garage (60527 SF). New Shell of 7 Story Multi Family Building (113387 SF). First Time Finish Out for Floor 1 (8002 SF). First Time Finish Out for Floor 2 (20610 SF). First Time Finish Out for Floor 3 (16955 SF). First Time Finish…
Interior alteration of an existing office space inclusive of (1) new demising wall interior alteration of an existing office space inclusive of (1) new demising wall
interior remodel to existing office space
One story tenant build out within an existing shell building
Interior Remodel to Existing 5th Floor- New Inpatient Units with NCCU and Universal Care Beds (372026 SF).
+40 more plan review cases in the full issue
+53 more issued permits in the full issue
How fit is scored for drywall and framing work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit drywall wording (drywall, framing, partitions, demising walls, ceilings). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Sep 28–Oct 4, 2026.
Start Your Free Trial8 commercial projects in city plan review and 11 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 8 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Ground up construction of a 27,200 SF industrial building with (2) 1,080 SF speculative offices
4325 SF Commercial Lease Space Build-Out for Nail Salon
First time finish out to create Spec Suite
Approx. 1786 sf of interior finish updates, no change of use, existing tenant. Existing pet services
Phase 2 - Build out of business lab in existing tenant space. No access control. No Hazmat component to this phase. No plumbing scope in this phase. No exterior work or…
Phase 2 Interior Remodel to Existing Floor 1 of Building 1. Phase 3 Interior Remodel to Existing Floor 1of Building 2. Phase 4 Interior Remodel to Existing Floor 2 of Building 2.
7 DAY - INTERIORE REMODEL TO EXISTING OFFICE SUITE WITH MEP SCOPE. NO ACCESS CONTROL. JBOX ROUGH IN ONLY FUTURE TENANT WILL APPLY FOR ACCESS CONTROL. - OVA
2026/10/02 - 2026/10/04 - Weekend 1| 2026/10/09 - 2026/10/11 - Weekend 2 | (2026/09/14) | Music stages food vendors art vendors & hospitality programs. October 2-4 & 9-11 2026 in Zilker Park.
2026/10/02 - 2026/10/03 | day mobile gym pop-up activation featuring gym workouts music and limited F&B
Verizon installing antennas lines cables and microwave dishes on the existing cell tower. No changes to the tower height.
+3 more plan review cases in the full issue
+6 more issued permits in the full issue
How fit is scored for drywall and framing work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit drywall wording (drywall, framing, partitions, demising walls, ceilings). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Oct 2, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Drywall / Framing) |
|---|---|---|---|---|---|
| Plan Review | Industrial building | New | $4.7M | ARCO Murray | Medium |
| Plan Review | Commercial remodel | Remodel | $500K est. (TDLR filing) | RH Pioneer North LLC | Medium |
| Plan Review | Commercial remodel | Remodel | $2M est. (TDLR filing) | 3724 Acquisitions LLC | Low |
| Plan Review | Commercial remodel | Remodel | N/A | N/A | Low |
| Plan Review | Lab remodel | Remodel | N/A | Karlin McCallen Pass LLC | Low |
| Issued Permit | Commercial remodel | Remodel | $2.1M est. (TDLR filing) | Sabre Commercial, Inc | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.