1. 2-story manufacturing plant
New construction of a two-story manufacturing facility consisting of a main factory (1,220,632 SF) with an attached two-story office (
From Monday, Aug 3 through Sunday, Aug 9, 2026, 51 commercial projects entered or moved through City of Austin plan review and 50 commercial building permits were issued. 8 plan review cases and 16 issued permits rate Strong or Medium for Flooring work.
This archived issue is ranked for Flooring work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Aug 7.
51 commercial projects in city plan review and 50 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 40 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
New construction of a two-story manufacturing facility consisting of a main factory (1,220,632 SF) with an attached two-story office (
Interior renovation of existing office space, B occupancy. Removal of existing wall partitions, doors, frames. Removal of existing ceiling tile and light fixtures. New…
BAUS Review - Interior Remodel to Existing Airport Lounge, Scope of Work to Include New Partitions, Doors, Finishes, Ceilings, Lighting, MEP, Sprinkler, and Fire Alarm…
Interior remodel existing hospital ground floor Endoscopy areas
Interior Remodel and Change of Use from Retail to Indoor Recreation Center (33,878 SF)
9667 SF Interior fit out for a non procedural facility. Scope includes the construction of new non load bearing partitions for new private offices break room waiting area reception and restroom. Finishes and MEP work to accommodate new work.
Interior remodel of customer service office. (Floor 1 and 2)
New Construction of Medical Office Building with New Parking Garage (75766 SF). New Construction of Parking Garage (75766 SF).
15 DAY - Expand main office with new conference room. Build single restrooms and prayer rooms at multiple satellite offices throughout building. Update finishes throughout building. - OVA
CHANGE OF USE MED OFFICE TO RETAIL with interior renovation of approx 3050 SF retail space including new partitions finishes fixtures and associated MEP modifications.
+46 more plan review cases in the full issue
+45 more issued permits in the full issue
How fit is scored for flooring work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit flooring wording (flooring, tile, carpet, LVT, epoxy, finishes). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Aug 3–9, 2026.
Start Your Free Trial7 commercial projects in city plan review and 6 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 4 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Change of Use from Fitness to Coffee Shop - Interior finish-out and renovation of an existing tenant space for a coffee shop. Scope includes construction of customer…
Finish out of an existing shell space for medical office
Interior Non-Structural Finish Out
2nd Generation Tenant Improvement Converting an (E) Whitebox space into a restaurant. The scope of work includes a new interior layout and associated mechanical,…
Change of use religous services to pet services
CHANGE OF USE MED OFFICE TO RETAIL with interior renovation of approx 3050 SF retail space including new partitions finishes fixtures and associated MEP modifications.
Interior remodel to admin/buisiness office.
Removal of Non-Bearing Interior Partition Walls Only. No Structural Mechanical Electrical Plumbing Fire Protection or Occupancy Changes. Conversion of Office into Out patience Rehabilitation Therapy Area 2026-073219 DA - Approved
SMALL PROJECT - Interior alteration of approximately 178 sq ft of existing interior space to create new IDF closet
Remove and replace existing galvalume roof on 100 X 100 building with new vinyl reinforced fiberglass insulation. Existing warehouse.
+2 more plan review cases in the full issue
+1 more issued permit in the full issue
How fit is scored for flooring work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit flooring wording (flooring, tile, carpet, LVT, epoxy, finishes). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Aug 7, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Flooring) |
|---|---|---|---|---|---|
| Plan Review | Change of use to retail space | Remodel | $280K est. (TDLR filing) | N/A | Low |
| Plan Review | Medical clinic remodel | Remodel | N/A | St Davids Healthcare Partnership LP LLP | Low |
| Plan Review | Commercial remodel | Remodel | $7.5M est. (TDLR filing) | SL Domain Tower II LP | Low |
| Plan Review | Restaurant remodel | Remodel | N/A | Scmr Austin Ltd | Low |
| Plan Review | Change of use to pet services | Remodel | N/A | Cleantag LLC | Low |
| Issued Permit | Change of use to retail space | Remodel | $130K est. (TDLR filing) | RaRE Enterprises, Inc | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.