1. 2-story manufacturing plant
New construction of a two-story manufacturing facility consisting of a main factory (1,220,632 SF) with an attached two-story office (
From Monday, Aug 3 through Sunday, Aug 9, 2026, 51 commercial projects entered or moved through City of Austin plan review and 50 commercial building permits were issued. 2 plan review cases and 2 issued permits rate Strong or Medium for Fire Sprinkler / Alarm work.
This archived issue is ranked for Fire Sprinkler / Alarm work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Aug 7.
51 commercial projects in city plan review and 50 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 40 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
New construction of a two-story manufacturing facility consisting of a main factory (1,220,632 SF) with an attached two-story office (
ePlan Review: New Shell Building, New Parking Garage, Demised Tenant Space 100, Demised Tenant Space 110, Demised Tenant Space 120, Demised Tenant Space 130 6…
Cut in new mobile dock door in existing concrete tilt-up building. no sqft added, no change in egress, occupancy load or fire protection
BAUS Review - Interior Remodel to Existing Airport Lounge, Scope of Work to Include New Partitions, Doors, Finishes, Ceilings, Lighting, MEP, Sprinkler, and Fire Alarm…
Interior Remodel and Change of Use from Retail to Indoor Recreation Center (33,878 SF)
New Construction of Medical Office Building with New Parking Garage (75766 SF). New Construction of Parking Garage (75766 SF).
Facade renovation of existing warehouse to shell condition including demolition of interior partitions modification of openings in tilt-wall addition and replacement of storefront and installation of new awnings and planters.
Construction of a new building addition and alteration to an existing two-story private club. Conventionally framed wood structure on a slab-on-ground steel-reinforced concrete slab.
2026/08/17 - 2026/08/22 | (2026/08/23) | A multi-day structured recruitment process involving scheduled events such as philanthropy sisterhood and preference rounds. Activities include organized group rotations presentations and supervised interactions…
Removal of Non-Bearing Interior Partition Walls Only. No Structural Mechanical Electrical Plumbing Fire Protection or Occupancy Changes. Conversion of Office into Out patience Rehabilitation Therapy Area 2026-073219 DA - Approved
+46 more plan review cases in the full issue
+45 more issued permits in the full issue
How fit is scored for fire sprinkler and alarm work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (hotels, apartments, schools, medical and assembly need sprinklers and alarm) and explicit sprinkler or alarm wording. Strong needs real size (20,000+ SF) or explicit scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Aug 3–9, 2026.
Start Your Free Trial7 commercial projects in city plan review and 6 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 4 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
2nd Generation Tenant Improvement Converting an (E) Whitebox space into a restaurant. The scope of work includes a new interior layout and associated mechanical,…
Finish out of an existing shell space for medical office
Change of Use from Fitness to Coffee Shop - Interior finish-out and renovation of an existing tenant space for a coffee shop. Scope includes construction of customer…
Interior Non-Structural Finish Out
Change of use religous services to pet services
Removal of Non-Bearing Interior Partition Walls Only. No Structural Mechanical Electrical Plumbing Fire Protection or Occupancy Changes. Conversion of Office into Out patience Rehabilitation Therapy Area 2026-073219 DA - Approved
CHANGE OF USE MED OFFICE TO RETAIL with interior renovation of approx 3050 SF retail space including new partitions finishes fixtures and associated MEP modifications.
Change of use to Medical Office and Remodel.
Interior remodel to admin/buisiness office.
SMALL PROJECT - Interior alteration of approximately 178 sq ft of existing interior space to create new IDF closet
+2 more plan review cases in the full issue
+1 more issued permit in the full issue
How fit is scored for fire sprinkler and alarm work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (hotels, apartments, schools, medical and assembly need sprinklers and alarm) and explicit sprinkler or alarm wording. Strong needs real size (20,000+ SF) or explicit scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Aug 7, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Fire Sprinkler / Alarm) |
|---|---|---|---|---|---|
| Plan Review | Restaurant remodel | Remodel | N/A | Scmr Austin Ltd | Low |
| Plan Review | Medical clinic remodel | Remodel | N/A | St Davids Healthcare Partnership LP LLP | Low |
| Plan Review | Change of use to retail space | Remodel | $280K est. (TDLR filing) | N/A | Low |
| Plan Review | Commercial remodel | Remodel | $7.5M est. (TDLR filing) | SL Domain Tower II LP | Low |
| Plan Review | Change of use to pet services | Remodel | N/A | Cleantag LLC | Low |
| Issued Permit | Office space remodel | Remodel | N/A | JCM Remodeling | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.