1. 10-story apartment building
Remodel of existing building and New construction addition to create a Mixed Use MF building. 102,878 SF of R occupancy among 27 dwelling units; with accessory uses of…
Permit expediter: Mercury Permits Inc
From Monday, Jul 6 through Sunday, Jul 12, 2026, 51 commercial projects entered or moved through City of Austin plan review and 50 commercial building permits were issued. 7 plan review cases and 16 issued permits rate Strong or Medium for Flooring work.
This archived issue is ranked for Flooring work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Jul 10.
51 commercial projects in city plan review and 50 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 35 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Remodel of existing building and New construction addition to create a Mixed Use MF building. 102,878 SF of R occupancy among 27 dwelling units; with accessory uses of…
Renovation of one room within existing Jared Jewelers space. Limited to replacing finishes, lighting, and outlets, cabinetry and equipment
Tenant Finish Out -Divide Floor 10 into 7 Spec Suites (1000, 1010,1020,1030,1040, 1050,1060)
Floor 2. Interior remodel of existing space. Demo and install new partition walls, new finished and lighting fixtures. Existing business offices
ePlan Review: Remodel Hospital - 2nd Floor - Surgery - with associated above and below ceiling/floor work and Remodel Hospital 2nd Floor - PACU - with associated above…
Remodel of restrooms on the first and second levels; new window openings in the existing exterior walls at weight room; new roof top skylights lighting and acoustical tiles at corridor north of competition gym
Interior remodel existing hospital areas. CT-2 (1st Floor)
CHANGE OF USE PERSONAL SERVICE TO RESTAURANT with interior renovation-work includes installation of owner provided equipment and new finishes
QT - the following work is occuring at an existing retirement living community - OVA 11 = Steel Piers - 30: G.L. Hunt Foundation Repair utilizes a steel pipe pressing method to ensure maximum stability for your home. 1 = Breakout - Exterior: G.L. Hunt…
ePlan: BAUS - First Time Finish out of New Airline Lounge (20500 SF)
+46 more plan review cases in the full issue
+45 more issued permits in the full issue
How fit is scored for flooring work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit flooring wording (flooring, tile, carpet, LVT, epoxy, finishes). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Jul 6–12, 2026.
Start Your Free Trial10 commercial projects in city plan review and 10 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 7 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Floor 2. Interior remodel of existing space. Demo and install new partition walls, new finished and lighting fixtures. Existing business offices
Interior Remodel and Change of Use from Historic Home to Restaurant. Scope of Work to include Remodel of an Existing Historic house (3,054 SF) and adding on a Glas
Single-Story New Construction Addition - Phase 2: Mercantile Occupancy Shell Space (Phase 1 Permit Case #)
Finish out for automotive repair
5 window replacements. Existing multifamily unit
QT - the following work is occuring at an existing retirement living community - OVA 11 = Steel Piers - 30: G.L. Hunt Foundation Repair utilizes a steel pipe pressing method to ensure maximum stability for your home. 1 = Breakout - Exterior: G.L. Hunt…
TENANT FINISH OUT - LAW OFFICES
REBUILD AFTER FIRE. WILL REPLACE DAMAGED FRAME DRYWALL INSULATION FLOORING AND PAINT WALLS. (Suite A - Floor 1) REBUILD AFTER FIRE. (Suite B - Floor 1) REBUILD AFTER FIRE. (Suite C - Floor 2) REBUILD AFTER FIRE. (Suite C - Floor 2)
re-roof at existing senior living facility main building
New Construction of a Religious Worship Facility.
+5 more plan review cases in the full issue
+5 more issued permits in the full issue
How fit is scored for flooring work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit flooring wording (flooring, tile, carpet, LVT, epoxy, finishes). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Jul 10, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Flooring) |
|---|---|---|---|---|---|
| Plan Review | Office space remodel | Remodel | $3.5M est. (TDLR filing) | N/A | Medium |
| Plan Review | Change of use to restaurant | Addition and Remodel | $1.0M | SoCo Legacy LLC dba Todd House LLC | Medium |
| Plan Review | Retail building | New | $200K est. (TDLR filing) | N/A | Medium |
| Plan Review | Automotive repair build-out | Remodel | N/A | JM Assets, L.P. | Low |
| Plan Review | Apartment building remodel | Remodel | N/A | N/A | Low |
| Issued Permit | Lab remodel | Remodel | N/A | GL Hunt Foundation Repair | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.