1. 10-story apartment building
Remodel of existing building and New construction addition to create a Mixed Use MF building. 102,878 SF of R occupancy among 27 dwelling units; with accessory uses of…
Permit expediter: Mercury Permits Inc
From Monday, Jul 6 through Sunday, Jul 12, 2026, 51 commercial projects entered or moved through City of Austin plan review and 50 commercial building permits were issued. 7 plan review cases and 12 issued permits rate Strong or Medium for Drywall / Framing work.
This archived issue is ranked for Drywall / Framing work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Jul 10.
51 commercial projects in city plan review and 50 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 35 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Remodel of existing building and New construction addition to create a Mixed Use MF building. 102,878 SF of R occupancy among 27 dwelling units; with accessory uses of…
CHANGE OF USE OFFICE TO RETAIL with Demo to interior walls, demo electrical in interior walls, install cameras in existing locations, re-route outlets and switches, all…
Floor 2. Interior remodel of existing space. Demo and install new partition walls, new finished and lighting fixtures. Existing business offices
7 DAY - demising wall to separate UT Co-Op (existing retail) 2246 Guadalupe suite from UFCU suite 2244 Guadalupe St. No access control, no mech or plumbing. - OVA NO…
ePlan Review: Remodel Hospital - 2nd Floor - Surgery - with associated above and below ceiling/floor work and Remodel Hospital 2nd Floor - PACU - with associated above…
ePlan: BAUS - First Time Finish out of New Airline Lounge (20500 SF)
TENANT FINISH OUT - LAW OFFICES
First Time Finish Out for The Twelve Thirty Club (38623 SF). Building Permit - Permit AddCycle tab Building Permit - Permit AddCycle tab Building Permit - Permit AddCycle tab Building Permit - Permit AddCycle tab Building Permit - Permit AddCycle tab Building…
REBUILD AFTER FIRE. WILL REPLACE DAMAGED FRAME DRYWALL INSULATION FLOORING AND PAINT WALLS. (Suite A - Floor 1) REBUILD AFTER FIRE. (Suite B - Floor 1) REBUILD AFTER FIRE. (Suite C - Floor 2) REBUILD AFTER FIRE. (Suite C - Floor 2)
re-roof at existing senior living facility main building
+46 more plan review cases in the full issue
+45 more issued permits in the full issue
How fit is scored for drywall and framing work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit drywall wording (drywall, framing, partitions, demising walls, ceilings). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Jul 6–12, 2026.
Start Your Free Trial10 commercial projects in city plan review and 10 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 7 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Floor 2. Interior remodel of existing space. Demo and install new partition walls, new finished and lighting fixtures. Existing business offices
Interior Remodel and Change of Use from Historic Home to Restaurant. Scope of Work to include Remodel of an Existing Historic house (3,054 SF) and adding on a Glas
Single-Story New Construction Addition - Phase 2: Mercantile Occupancy Shell Space (Phase 1 Permit Case #)
Finish out for automotive repair
5 window replacements. Existing multifamily unit
TENANT FINISH OUT - LAW OFFICES
REBUILD AFTER FIRE. WILL REPLACE DAMAGED FRAME DRYWALL INSULATION FLOORING AND PAINT WALLS. (Suite A - Floor 1) REBUILD AFTER FIRE. (Suite B - Floor 1) REBUILD AFTER FIRE. (Suite C - Floor 2) REBUILD AFTER FIRE. (Suite C - Floor 2)
re-roof at existing senior living facility main building
New Construction of a Religious Worship Facility.
New Construction for POS (Pay Station Canopy) New Construction for 15 Bay Vacuum Canopy. New Construction for 6 Bay Vacuum Canopy New construction for dumpster enclosure
+5 more plan review cases in the full issue
+5 more issued permits in the full issue
How fit is scored for drywall and framing work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit drywall wording (drywall, framing, partitions, demising walls, ceilings). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Jul 10, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Drywall / Framing) |
|---|---|---|---|---|---|
| Plan Review | Office space remodel | Remodel | $3.5M est. (TDLR filing) | N/A | Medium |
| Plan Review | Change of use to restaurant | Addition and Remodel | $1.0M | SoCo Legacy LLC dba Todd House LLC | Medium |
| Plan Review | Retail building | New | $200K est. (TDLR filing) | N/A | Medium |
| Plan Review | Automotive repair build-out | Remodel | N/A | JM Assets, L.P. | Low |
| Plan Review | Apartment building remodel | Remodel | N/A | N/A | Low |
| Issued Permit | Office space remodel | Remodel | $1.5M est. (TDLR filing) | Harvey-Cleary Builders | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.