1. Change of use to restaurant
CHANGE OF USE TO FOOD SALES/cafe selling cakes and serving cake slices and pastries. No food preparation. All food prepared offsite.
No company contact in the City data beyond the permit expediter.
From Monday, Jun 15 through Sunday, Jun 21, 2026, 24 commercial projects entered or moved through City of Austin plan review and 77 commercial building permits were issued. 2 plan review cases and 6 issued permits rate Strong or Medium for Kitchen Equipment work.
This archived issue is ranked for Kitchen Equipment work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Jun 19.
24 commercial projects in city plan review and 77 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 60 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
CHANGE OF USE TO FOOD SALES/cafe selling cakes and serving cake slices and pastries. No food preparation. All food prepared offsite.
Interior tenant improvement for a new indoor pickleball within a renovated commercial shell. Scope includes non-structural partitions, new kitchen and MEP upgrades, no…
Rebuild of a convenience store on existing site (bldg destroyed by fire)
New Construction of Austin Country Club (206,88 SF)
Replace existing outside attractions, landscaping, and theming
Interiors finish out for restaurant
Interior finish out of a portion of an existing building floor for a new tenant. The scope includes selective demolition; installation of new non structural partitions ceilings finishes and millwork; placement of furniture and equipment; and associated MEP…
Tenant finish out of an existing lease space for a restaurant.
Finish out to existing mixed use bldg-suite 101 is an existing shell. Proposed bookstore with accessory coffee shop GIIVR requested. NO access control. No mechanical scope.
Condominium renovation includes kitchen bathrooms and bedrooms for Unit 2007
+19 more plan review cases in the full issue
+72 more issued permits in the full issue
How fit is scored for kitchen and food-service equipment work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit food-service wording (kitchen, restaurant, cafe, bar, hood, walk-in cooler). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Jun 15–21, 2026.
Start Your Free Trial0 commercial projects in city plan review and 7 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 6 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
No plan review cases.
TPO Reroof. Existing union hall.
Interior Remodel to Existing Light Manufacturing Areas (128726 SF).
Addition of new demising wall to create suite 330 from approx. 1292SF of existing interior space Addition of new D wall to create suite 330 from approx. (3426 F) of existing interior space.
Interior alteration to approx. 2213 SF of existing interior space for Suite 160 NEW `D WALL TO CREATE SUTIE 155 WITH APPROX. (1043SF) OF EXISTING INTERIOR SPACE
Interior alteration of existing space (Suite 360 approx 6508) (Suite 365 approx 1083) and new D wall to create Suite 380 (approx 2179 sf) Floor 3 Interior alteration of existing space (Suite 360 approx 6508) (Suite 365 approx 1083) and new D wall to create…
+2 more issued permits in the full issue
How fit is scored for kitchen and food-service equipment work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit food-service wording (kitchen, restaurant, cafe, bar, hood, walk-in cooler). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Jun 19, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Kitchen Equipment) |
|---|---|---|---|---|---|
| Issued Permit | Commercial remodel | Remodel | $179K | Texas Storm Group, LLC | Low |
| Issued Permit | Manufacturing plant remodel | Remodel | N/A | CM Constructors | Low |
| Issued Permit | Commercial remodel | Remodel | $190K est. (TDLR filing) | Qual-Con General Contractor LLC | Low |
| Issued Permit | Commercial remodel | Remodel | $190K est. (TDLR filing) | Qual-Con General Contractor LLC | Low |
| Issued Permit | Commercial remodel | Remodel | $190K est. (TDLR filing) | Qual-Con General Contractor LLC | Low |
A preview of 5 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.