1. Change of use to restaurant
Interior Remodel and Change of Use from Business Office to Professional Office/Restaurant (20,555 SF)
From Monday, Jun 8 through Sunday, Jun 14, 2026, 38 commercial projects entered or moved through City of Austin plan review and 66 commercial building permits were issued. 5 plan review cases and 8 issued permits rate Strong or Medium for Kitchen Equipment work.
This archived issue is ranked for Kitchen Equipment work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Jun 12.
38 commercial projects in city plan review and 66 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 50 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior Remodel and Change of Use from Business Office to Professional Office/Restaurant (20,555 SF)
Finish Out for Restaurant (4,890 SF)
CHANGE OF USE PERSONAL SERVICE TO RESTAURANT with interior renovation-work includes installation of owner provided equipment and new finishes.
Remodel of existing restaurant. Approved SPE for walk-up window and GI clean out
Ground-up construction of a 409,078 square-foot, single-story tilt-wall shell building designed as a cold dark shell for future tenant build-out. Building 2…
Change of Use from Meat Market Butcher shop to Restaurant with Retail and Added New Deck Area (3872 SF)
NEW C-STORE W/ RESTAURANT.
Change of Use - Interior renovation of existing vacant unit to a counter service food facility serving juice and bowl. No food will be cooked inside the suite.
Interior remodel of existing restaurant. No change of use or occupancy no increase in square footage.
Plan: Commercial Expedited Review - Interior Finish out of Shell Building to Create Restaurant (2162SF).
+33 more plan review cases in the full issue
+61 more issued permits in the full issue
How fit is scored for kitchen and food-service equipment work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit food-service wording (kitchen, restaurant, cafe, bar, hood, walk-in cooler). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Jun 8–14, 2026.
Start Your Free Trial9 commercial projects in city plan review and 8 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 8 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior Remodel to Existing Office Space (21,830 SF) and demo only of future lab space (6,300 SF) (28,130 SF total)
1,155 SF retail tenant expansion of 7,013 SF existing retail space. No exterior changes proposed. ATTN ELEC INSP: Color coding of conductors shall be consistent at all…
Reconstruction from previous water damage.
Remodel to Existing FedEx Building. Work to include Additional conveyor and electrical for new conveyor will be integrated into existing conveyor syst
Foundation Repair - Install 8 steel pilings to stabilize foundation
RE-ROOF - re roof existing office building - OVA
INTERIOR ALTERATION OF APPROX (2314 SF) OF EXISTING INTERIOR SPACE. (Floor 6)
Interior Remodel to Existing Business Lab (148132 SF).
Change of use to personal services and renovating an existing tenant space for a new barbershop.
New Amusement Park Feature ATR 34 Splash Pad / Pump Room
+4 more plan review cases in the full issue
+3 more issued permits in the full issue
How fit is scored for kitchen and food-service equipment work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit food-service wording (kitchen, restaurant, cafe, bar, hood, walk-in cooler). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Jun 12, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Kitchen Equipment) |
|---|---|---|---|---|---|
| Plan Review | Lab remodel | Remodel | $5.8M est. (TDLR filing) | Opus Design Build, LLC | Low |
| Plan Review | Retail space remodel | Remodel | $250K est. (TDLR filing) | N/A | Low |
| Plan Review | Commercial remodel | Remodel | N/A | N/A | Low |
| Plan Review | Commercial remodel | Remodel | $211K est. (TDLR filing) | Designed Conveyor Systems | Low |
| Plan Review | Commercial remodel | Remodel | N/A | Cubesmart LP | Low |
| Issued Permit | Office space remodel | Remodel | $127K | Port Enterprises, Ltd | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.