1. 5-story education/admin building (church campus)
Construction of new 2-story education and administration building with walk-out basement. New construction of a metal fire pump enclosure building. Limited interior…
From Monday, Jun 8 through Sunday, Jun 14, 2026, 38 commercial projects entered or moved through City of Austin plan review and 66 commercial building permits were issued. 2 plan review cases and 1 issued permit rate Strong or Medium for Elevator work.
This archived issue is ranked for Elevator work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Jun 12.
38 commercial projects in city plan review and 66 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 50 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Construction of new 2-story education and administration building with walk-out basement. New construction of a metal fire pump enclosure building. Limited interior…
Ground-up construction of a 409,078 square-foot, single-story tilt-wall shell building designed as a cold dark shell for future tenant build-out. Building 2…
Ground-up construction of a 136,145-square-foot, single-story tilt-wall shell building designed as a cold dark shell for future tenant build-out. Building 1…
New control building and lift station upgrades
New construction of 3,000 sf retail, 3,000 sf office, 9,000 sf warehouse
ePlan: Expedited Review - New Construction of a Multi-Story Mixed Use Multi-Family Bldg. with Parking Garage - Lake View East - Module B ePlan: Expedited Review - New Construction of a Multi-Story Mixed Use Multi-Family Bldg. with Parking Garage - Lake View…
New Construction fine arts building for private school.
46000 SF of Level I and II interior renovations (IEBC) to an existing building for Round Rock ISD & minor site improvements.
Flooring and Ceiling Replacement. Addition of one mini split for Round Rock ISD
Foundation Repair
+33 more plan review cases in the full issue
+61 more issued permits in the full issue
How fit is scored for elevator work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit elevator wording (elevator, lift, escalator). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Jun 8–14, 2026.
Start Your Free Trial9 commercial projects in city plan review and 8 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 8 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior Remodel to Existing Office Space (21,830 SF) and demo only of future lab space (6,300 SF) (28,130 SF total)
1,155 SF retail tenant expansion of 7,013 SF existing retail space. No exterior changes proposed. ATTN ELEC INSP: Color coding of conductors shall be consistent at all…
Reconstruction from previous water damage.
Remodel to Existing FedEx Building. Work to include Additional conveyor and electrical for new conveyor will be integrated into existing conveyor syst
Foundation Repair - Install 8 steel pilings to stabilize foundation
RE-ROOF - re roof existing office building - OVA
INTERIOR ALTERATION OF APPROX (2314 SF) OF EXISTING INTERIOR SPACE. (Floor 6)
Interior Remodel to Existing Business Lab (148132 SF).
Change of use to personal services and renovating an existing tenant space for a new barbershop.
New Amusement Park Feature ATR 34 Splash Pad / Pump Room
+4 more plan review cases in the full issue
+3 more issued permits in the full issue
How fit is scored for elevator work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit elevator wording (elevator, lift, escalator). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Jun 12, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Elevator) |
|---|---|---|---|---|---|
| Plan Review | Lab remodel | Remodel | $5.8M est. (TDLR filing) | Opus Design Build, LLC | Low |
| Plan Review | Retail space remodel | Remodel | $250K est. (TDLR filing) | N/A | Low |
| Plan Review | Commercial remodel | Remodel | N/A | N/A | Low |
| Plan Review | Commercial remodel | Remodel | $211K est. (TDLR filing) | Designed Conveyor Systems | Low |
| Plan Review | Commercial remodel | Remodel | N/A | Cubesmart LP | Low |
| Issued Permit | Office space remodel | Remodel | $127K | Port Enterprises, Ltd | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.