1. Commercial remodel
7 DAY - site improvements including increase in pumping capacity and accessibility to accommodate for increase in expected flows at lift station. City of Austin project…
From Monday, Jun 15 through Sunday, Jun 21, 2026, 24 commercial projects entered or moved through City of Austin plan review and 77 commercial building permits were issued. 3 plan review cases and 7 issued permits rate Strong or Medium for Concrete / Foundation work.
This archived issue is ranked for Concrete / Foundation work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Jun 19.
24 commercial projects in city plan review and 77 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 60 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
7 DAY - site improvements including increase in pumping capacity and accessibility to accommodate for increase in expected flows at lift station. City of Austin project…
Rebuild of a convenience store on existing site (bldg destroyed by fire)
New Construction of Austin Country Club (206,88 SF)
Replace existing outside attractions, landscaping, and theming
Converting a bathtub to a walk in shower no changes to plumbing or framing. Existing multifamily
EPLAN-New Construction of Office/Retail Shell Building *NOT FOR OCCUPANCY*
New shade structures over existing Impervious Cover parking lot Exterior construction CP1 CP2 CP3 CP4 and CP5 New shade structures over existing Impervious Cover parking lot Exterior construction CP1 CP2 CP3 CP4 and CP5 New shade structures over existing…
New portable and flatwork. 2026 067974 DA - Approved.
New portable and flatwork. 2026-067987 DA.
New-construction shell building of approx. 12000 SF to house future medical offices -Bldg. 3.
+19 more plan review cases in the full issue
+72 more issued permits in the full issue
How fit is scored for concrete and foundation work: points for size (square feet), scope (new buildings, shells and additions score highest, site and paving work next, interior remodels lowest) and explicit concrete wording (foundation, slab, piers, tilt-wall, post-tension, paving, parking garage, sidewalks, retaining walls, site work). Strong needs a new building, shell or addition of 10,000+ SF or explicit concrete scope; interior finish-outs rate Low; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Jun 15–21, 2026.
Start Your Free Trial0 commercial projects in city plan review and 7 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 6 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
No plan review cases.
New portable and flatwork. 2026-067987 DA.
Pickle Elementary - Install two shade structures.
TPO Reroof. Existing union hall.
Interior Remodel to Existing Light Manufacturing Areas (128726 SF).
Addition of new demising wall to create suite 330 from approx. 1292SF of existing interior space Addition of new D wall to create suite 330 from approx. (3426 F) of existing interior space.
+2 more issued permits in the full issue
How fit is scored for concrete and foundation work: points for size (square feet), scope (new buildings, shells and additions score highest, site and paving work next, interior remodels lowest) and explicit concrete wording (foundation, slab, piers, tilt-wall, post-tension, paving, parking garage, sidewalks, retaining walls, site work). Strong needs a new building, shell or addition of 10,000+ SF or explicit concrete scope; interior finish-outs rate Low; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Jun 19, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Concrete / Foundation) |
|---|---|---|---|---|---|
| Issued Permit | Addition | Addition | $100K | Jamail & Smith Construction | Medium |
| Issued Permit | New building | New | $6K | Paradigm Contracting LLC | Medium |
| Issued Permit | Commercial remodel | Remodel | $179K | Texas Storm Group, LLC | Low |
| Issued Permit | Manufacturing plant remodel | Remodel | N/A | CM Constructors | Low |
| Issued Permit | Commercial remodel | Remodel | $190K est. (TDLR filing) | Qual-Con General Contractor LLC | Low |
A preview of 5 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.