Archive · Week of May 25–31, 2026 · Kitchen Equipment

Austin Kitchen Equipment Permit Leads: May 25–31, 2026

From Monday, May 25 through Sunday, May 31, 2026, 31 commercial projects entered or moved through City of Austin plan review and 40 commercial building permits were issued. 2 plan review cases and 3 issued permits rate Strong or Medium for Kitchen Equipment work.

This archived issue is ranked for Kitchen Equipment work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, May 29.

Austin Permit Leads · Weekly Digest

Week of May 25–31, 2026

31 commercial projects in city plan review and 40 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 32 of the issued permits were previously in plan review and are marked, so nothing shows up twice.

In Plan Review: Week of May 25–31

Issued Permits: Week of May 25–31

1. Addition and remodel, restaurant

New this week (applied May 29)
Addition and Remodel · applied May 29 · Approved and Released as of Aug 19, 2026 · 18,800 SF · $1.5M est. (TDLR filing)
Kitchen Equipment: Strong fit · score 75

Addition and Remodel to Existing Restaurant. Work to include Expanding Restaurant into adjacent Space (18,800 SF)

Permit expediter: Lccp, LLC
No company contact in the City data beyond the permit expediter.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.

2. Restaurant remodel

New this week (applied May 28)
Remodel · applied May 28 · Awaiting Update · $275K est. (TDLR filing)
Kitchen Equipment: Medium fit · score 55

Tenant improvement for new restaurant FR 2026 067348 ATTN ELEC INSP The GFCI protection required in 210.8(A) and (B) shall be readily accessible. 2023 NEC article 210.8

Permit expediter: KS Permitting LLC
No company contact in the City data beyond the permit expediter.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.

3. Commercial remodel

New this week (applied May 28)
Remodel · applied May 28 · Approved as of Aug 3, 2026 · 24,387 SF · $31M est. (TDLR filing)
Kitchen Equipment: Low fit · score 28

Returning Existing Building 902 back to shell and interior alteration of 24387 sf of existing interior space ATTN ELEC INSP: Plaque required at Main utility electrical…

Permit expediter: Guidance Permitting
No company contact in the City data beyond the permit expediter.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.

4. New building

New this week (applied May 26)
New · applied May 26 · Awaiting Update · 9,604 SF · $125K est. (TDLR filing)
Kitchen Equipment: Low fit · score 12

New Construction of a 140' auto wash tunnel, Construction of a 1,732 SF canopy, Construction of a 858 SF canopy, Construction of a 2,111 SF canopy, and Construction of a…

Applicant: QuikTrip Corporation
View on City of Austin AB+C Portal

5. Hospital remodel

New this week (applied May 27)
Remodel · applied May 27 · Approved as of Jul 22, 2026 · $345K est. (TDLR filing)
Kitchen Equipment: Low fit · score 10

X Ray replacement on the lower level of an existing hospital

Permit expediter: KS Permitting LLC
No company contact in the City data beyond the permit expediter.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.

1. Restaurant remodel

Permit issued May 28
Remodel · 32 SF · issued May 28
Kitchen Equipment: Medium fit · score 55

Replace the kitchen hood in the cafeteria.

GC or design-builder: JWI Construction Inc
View on City of Austin AB+C Portal

2. School remodel

Permit issued May 28
Remodel · 1,995 SF · $1.3M est. (TDLR filing) · issued May 28
Kitchen Equipment: Medium fit · score 55

AISD Travis Heights Elementary School in Austin: project involves roof replacement at the Pre K classrooms cafeteria and gym electrical panel cover replacement at the gym stage installation of emergency lighting in classrooms and corridors replacement of…

GC or design-builder: Amstar, Inc
View on City of Austin AB+C Portal

3. Change of use to billiard the project includes

Permit issued May 28
Remodel · 1,225 SF · issued May 28
Kitchen Equipment: Medium fit · score 55

CHANGE OF USE FROM RETAIL TO BILLIARD The project includes electrical and plumbing installations meeting City of Austin codes and Plumbing Install supply and drainage lines for a bar sink

GC or design-builder: Austin Snooker And Billiard Tavern LLC
View on City of Austin AB+C Portal

4. Restaurant

Permit issued May 29
New · issued May 29
Kitchen Equipment: Low fit · score 39

2026/05/29 |*TEMP. BUILDING ONLY* | Austin Mezcal Festival - The event has music food and mezcal tasting with bar having drinks for sell along with local vendors plus a Lucha Libre wrestling match in a boxing ring we will be hiring a company to build outside…

Owner/Developer: City of Austin (from 2026 site plan SPC-2026-0166C)
View on City of Austin AB+C Portal

5. 16-story shell building

Permit issued May 26
Shell · 165,522 SF · $30.0M · issued May 26
Kitchen Equipment: Low fit · score 35

ePlan: Expedited Review - Level 3 Alteration to existing 16-Story High-Rise Structure to create a Congregate Living Shell Bldg. with Core Improvements. (165522 SF)

GC or design-builder: Bartlett Cocke General Contractors
View on City of Austin AB+C Portal

+26 more plan review cases in the full issue

+35 more issued permits in the full issue

How fit is scored for kitchen and food-service equipment work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit food-service wording (kitchen, restaurant, cafe, bar, hood, walk-in cooler). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.

Showing the top leads in each section for the week of May 25–31, 2026.

Start Your Free Trial
Austin Permit Leads · Daily Recap

Friday, May 29, 2026

5 commercial projects in city plan review and 7 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 5 of the issued permits were previously in plan review and are marked, so nothing shows up twice.

In Plan Review: Fri, May 29

Issued Permits: Fri, May 29

1. Addition and remodel, restaurant

New today (applied May 29)
Addition and Remodel · applied May 29 · Approved and Released as of Aug 19, 2026 · 18,800 SF · $1.5M est. (TDLR filing)
Kitchen Equipment: Strong fit · score 75

Addition and Remodel to Existing Restaurant. Work to include Expanding Restaurant into adjacent Space (18,800 SF)

Permit expediter: Lccp, LLC
No company contact in the City data beyond the permit expediter.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.

2. Temporary construction trailer

Moved to Awaiting Update - Fee Paid May 29
New · applied Apr 22 · Awaiting Update - Fee Paid · 1,440 SF
Kitchen Equipment: Low fit · score 0

BAUS Review- Temporary Construction Trailer to House Water Holding Tanks and Temp. Electrical Skid for Power (1,440 SF)

Architect/Engineer: MWM Designgroup (from 2020 site plan SP-2020-0602C)
View on City of Austin AB+C Portal

3. Apartment building remodel

New today (applied May 29)
Remodel · applied May 29 · Approved as of Jul 13, 2026
Kitchen Equipment: Low fit · score 0

Remove and replace 7 windows and 1 sliding glass door like for like, no structural changes. Existing multifamily unit

No company contact in the City data.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.

4. Commercial remodel

New today (applied May 29)
Remodel · applied May 29 · Approved and Released as of Jul 9, 2026 · $100K est. (TDLR filing)
Kitchen Equipment: Low fit · score 0

ePlan Review: Relocation of two portable buildings within the same lot, including the construction of deck ramps.

Owner/Developer: Calatlantic Homes of Texas Inc
Permit expediter: Austin Permit Service Inc
View on City of Austin AB+C Portal

5. Restaurant remodel

New today (applied May 29)
Remodel · applied May 29 · Approved as of Jun 10, 2026
Kitchen Equipment: Low fit · score 0

Extend existing partition to front of patio to Cocktail Lounge

Owner/Developer: Montwalk Holdings Ltd
Permit expediter: Aus-Tex Building Consultants
View on City of Austin AB+C Portal

1. Restaurant

Permit issued May 29
New · issued May 29
Kitchen Equipment: Low fit · score 39

2026/05/29 |*TEMP. BUILDING ONLY* | Austin Mezcal Festival - The event has music food and mezcal tasting with bar having drinks for sell along with local vendors plus a Lucha Libre wrestling match in a boxing ring we will be hiring a company to build outside…

Owner/Developer: City of Austin (from 2026 site plan SPC-2026-0166C)
View on City of Austin AB+C Portal

2. Office space remodel

Permit issued May 29
Remodel · 35,000 SF · $980K · issued May 29
Kitchen Equipment: Low fit · score 28

Simple Re Roof. Existing Office Building.

GC or design-builder: Empire Roofing Companies LLC
View on City of Austin AB+C Portal

3. School remodel

Permit issued May 29
Remodel · 27,940 SF · $230K est. (TDLR filing) · issued May 29
Kitchen Equipment: Low fit · score 28

AISD Bond 2022 modernization of Fine Arts and Athletics program spaces. Renovation of Music studios Dance Arts 2D and 3D Art. Renovation of Athletics Trainers Room.

GC or design-builder: Swinerton Builders Inc
View on City of Austin AB+C Portal

5. Commercial remodel

Permit issued May 29
Remodel · 340 SF · issued May 29
Kitchen Equipment: Low fit · score 0

Stucco repairs to exterior of building. Replace rotted wood as needed.

GC or design-builder: Ace Nationwide Construction
View on City of Austin AB+C Portal

+2 more issued permits in the full issue

How fit is scored for kitchen and food-service equipment work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit food-service wording (kitchen, restaurant, cafe, bar, hood, walk-in cooler). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.

Showing the top leads in each section for Friday, May 29, 2026.

Start Your Free Trial

Daily Recap Spreadsheet Preview

Daily Recap Feature
Plan Review or Issued PermitAddress / ProjectWorkValuationCompanyFit (Kitchen Equipment)
Plan ReviewAddition and remodel, restaurantAddition and Remodel$1.5M est. (TDLR filing)N/AStrong
Plan ReviewTemporary construction trailerNewN/AMWM DesigngroupLow
Plan ReviewApartment building remodelRemodelN/AN/ALow
Plan ReviewCommercial remodelRemodel$100K est. (TDLR filing)Calatlantic Homes of Texas IncLow
Plan ReviewRestaurant remodelRemodelN/AMontwalk Holdings LtdLow
Issued PermitRestaurantNewN/ACity of AustinLow

A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.

← Previous WeekAll WeeksNext Week →

Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.