Austin Permit Leads · Weekly Digest
Week of May 25–31, 2026
31 commercial projects in city plan review and 40 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 32 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
In Plan Review: Week of May 25–31
Issued Permits: Week of May 25–31
1. Commercial remodel
New this week (applied May 28)
Remodel · applied May 28 · Approved as of Aug 3, 2026 · 24,387 SF · $31M est. (TDLR filing)
Electrical: Strong fit · score 72
Returning Existing Building 902 back to shell and interior alteration of 24387 sf of existing interior space ATTN ELEC INSP: Plaque required at Main utility electrical…
Permit expediter: Guidance Permitting
No company contact in the City data beyond the permit expediter.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.2. Medical clinic (MRI/CT suite) remodel
New this week (applied May 26)
Remodel · applied May 26 · Awaiting Update · $1.5M est. (TDLR filing)
Electrical: Medium fit · score 55
Interior remodel of existing medical office clinic without change of use to new MRI/CT suite. Project includes installation of new mechanical and electrical equipment in…
Architect/Engineer: Lawrence Group
View on City of Austin AB+C Portal3. Restaurant remodel
New this week (applied May 28)
Remodel · applied May 28 · Awaiting Update · $275K est. (TDLR filing)
Electrical: Medium fit · score 48
Tenant improvement for new restaurant FR 2026 067348 ATTN ELEC INSP The GFCI protection required in 210.8(A) and (B) shall be readily accessible. 2023 NEC article 210.8
Permit expediter: KS Permitting LLC
No company contact in the City data beyond the permit expediter.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.4. Lab remodel
New this week (applied May 26)
Remodel · applied May 26 · Approved as of Jun 15, 2026
Electrical: Medium fit · score 47
THE ADDITION OF RF CHAMBERS TO A LAB SPACE WITHIN A COMMERCIAL OFFICE ON LEVEL 5. INCLUDES ASSOCIATED ELECTRICAL IMPROVEMENTS No access control. No mechanical or…
Architect/Engineer: Interior Architects
View on City of Austin AB+C Portal5. Addition and remodel, restaurant
New this week (applied May 29)
Addition and Remodel · applied May 29 · Approved and Released as of Aug 19, 2026 · 18,800 SF · $1.5M est. (TDLR filing)
Electrical: Medium fit · score 40
Addition and Remodel to Existing Restaurant. Work to include Expanding Restaurant into adjacent Space (18,800 SF)
Permit expediter: Lccp, LLC
No company contact in the City data beyond the permit expediter.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.1. 16-story shell building
Permit issued May 26
Shell · 165,522 SF · $30.0M · issued May 26
Electrical: Medium fit · score 53
ePlan: Expedited Review - Level 3 Alteration to existing 16-Story High-Rise Structure to create a Congregate Living Shell Bldg. with Core Improvements. (165522 SF)
Previously in Plan Review (2025-008973 PR)
GC or design-builder: Bartlett Cocke General Contractors
View on City of Austin AB+C Portal2. New 2-story building
Permit issued May 27
New · 500 SF · $610M est. (TDLR filing) · issued May 27
Electrical: Medium fit · score 50
UPS-LV-DH-P1-A- New Installation of Tracking Equipment and Inspection (335 SF) UPS-LV-DH-P1-B-New Installation of Tracking Equipment and Inspection (335 SF). UPS-LC-DH-P2-C-New Installation of Tracking Equipment and Inspection (335 SF). UPS-MV-DH1-1-C-New…
Previously in Plan Review (2026-111826 PR)
GC or design-builder: Turner Construction
View on City of Austin AB+C Portal3. School remodel
Permit issued May 28
Remodel · 1,995 SF · $1.3M est. (TDLR filing) · issued May 28
Electrical: Medium fit · score 43
AISD Travis Heights Elementary School in Austin: project involves roof replacement at the Pre K classrooms cafeteria and gym electrical panel cover replacement at the gym stage installation of emergency lighting in classrooms and corridors replacement of…
Previously in Plan Review (2026-026567 PR)
GC or design-builder: Amstar, Inc
View on City of Austin AB+C Portal4. Commercial remodel
Permit issued May 26
Remodel · 2,766 SF · issued May 26
Electrical: Medium fit · score 41
Rooftop Solar Line Side Tap Interconnection
Previously in Plan Review (2026-062277 PR)
GC or design-builder: Lighthouse Solar Austin
View on City of Austin AB+C Portal5. Commercial remodel
Permit issued May 26
Remodel · 2,572 SF · issued May 26
Electrical: Medium fit · score 41
SMART housing. Rooftop Solar. Line side tap interconnection.
Previously in Plan Review (2026-063621 PR)
GC or design-builder: Lighthouse Solar Austin
View on City of Austin AB+C Portal+26 more plan review cases in the full issue
+35 more issued permits in the full issue
How fit is scored for electrical work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (labs, data, medical, hotels, grocery and industrial carry the most electrical load) and explicit electrical wording (service upgrade, switchgear, transformer, generator, EV charging, lighting, solar). Strong needs real size (20,000+ SF) or explicit electrical scope; small pieces of larger projects are flagged and capped at Medium.