1. Lab remodel
7 DAY - Interior remodel. change single door to double door. bench lab with table power. open call b at existing admin space - OVA
From Monday, May 25 through Sunday, May 31, 2026, 31 commercial projects entered or moved through City of Austin plan review and 40 commercial building permits were issued. 6 plan review cases and 8 issued permits rate Strong or Medium for Doors & Hardware work.
This archived issue is ranked for Doors & Hardware work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, May 29.
31 commercial projects in city plan review and 40 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 32 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
7 DAY - Interior remodel. change single door to double door. bench lab with table power. open call b at existing admin space - OVA
Returning Existing Building 902 back to shell and interior alteration of 24387 sf of existing interior space ATTN ELEC INSP: Plaque required at Main utility electrical…
Addition and Remodel to Existing Restaurant. Work to include Expanding Restaurant into adjacent Space (18,800 SF)
New Construction of a 140' auto wash tunnel, Construction of a 1,732 SF canopy, Construction of a 858 SF canopy, Construction of a 2,111 SF canopy, and Construction of a…
Repair exterior stucco failures, repaint all exterior walls with elastomeric paint, and replace doors and windows for: 1707 Spyglass, 1731 Spyglass, 1735 Spyglass for…
Interior Remodel to Add Door and Glass Wall for B100
ePlan: Expedited Review - Level 3 Alteration to existing 16-Story High-Rise Structure to create a Congregate Living Shell Bldg. with Core Improvements. (165522 SF)
New shell building and finish-out for banquet hall (Building 1-5499 sf). New Construction of shell building (Building 2 - 14023 sf and 3 - 9371 sf) with interior finish outs. Oncor electric WO #2643964. (12 apps)
Application 1. First generation interior tenant office space. Includes typical private offices open office workstations conference rooms. Breakroom is NOT getting built out. This is the only permit for Suite 300. Application 2. This is the only permit for…
AISD Travis Heights Elementary School in Austin: project involves roof replacement at the Pre K classrooms cafeteria and gym electrical panel cover replacement at the gym stage installation of emergency lighting in classrooms and corridors replacement of…
+26 more plan review cases in the full issue
+35 more issued permits in the full issue
How fit is scored for doors and hardware work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit door wording (doors, hardware, openings, frames, egress). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of May 25–31, 2026.
Start Your Free Trial5 commercial projects in city plan review and 7 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 5 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Addition and Remodel to Existing Restaurant. Work to include Expanding Restaurant into adjacent Space (18,800 SF)
Remove and replace 7 windows and 1 sliding glass door like for like, no structural changes. Existing multifamily unit
BAUS Review- Temporary Construction Trailer to House Water Holding Tanks and Temp. Electrical Skid for Power (1,440 SF)
ePlan Review: Relocation of two portable buildings within the same lot, including the construction of deck ramps.
Extend existing partition to front of patio to Cocktail Lounge
Interior Remodel to Add Door and Glass Wall for B100
Finish out for admin office.
Simple Re Roof. Existing Office Building.
AISD Bond 2022 modernization of Fine Arts and Athletics program spaces. Renovation of Music studios Dance Arts 2D and 3D Art. Renovation of Athletics Trainers Room.
2026/05/29 |*TEMP. BUILDING ONLY* | Austin Mezcal Festival - The event has music food and mezcal tasting with bar having drinks for sell along with local vendors plus a Lucha Libre wrestling match in a boxing ring we will be hiring a company to build outside…
+2 more issued permits in the full issue
How fit is scored for doors and hardware work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit door wording (doors, hardware, openings, frames, egress). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, May 29, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Doors & Hardware) |
|---|---|---|---|---|---|
| Plan Review | Addition and remodel, restaurant | Addition and Remodel | $1.5M est. (TDLR filing) | N/A | Medium |
| Plan Review | Apartment building remodel | Remodel | N/A | N/A | Medium |
| Plan Review | Temporary construction trailer | New | N/A | MWM Designgroup | Low |
| Plan Review | Commercial remodel | Remodel | $100K est. (TDLR filing) | Calatlantic Homes of Texas Inc | Low |
| Plan Review | Restaurant remodel | Remodel | N/A | Montwalk Holdings Ltd | Low |
| Issued Permit | Commercial remodel | Remodel | $1.3M est. (TDLR filing) | Rogers-O'Brien Construction | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.