1. Change of use to restaurant
Change of Use from Cocktail Bar to a Full-Service Restaurant (5,400 SF)
No company contact in the City data beyond the permit expediter.
From Monday, Apr 6 through Sunday, Apr 12, 2026, 43 commercial projects entered or moved through City of Austin plan review and 56 commercial building permits were issued. 7 plan review cases and 10 issued permits rate Strong or Medium for Kitchen Equipment work.
This archived issue is ranked for Kitchen Equipment work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Apr 10.
43 commercial projects in city plan review and 56 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 42 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Change of Use from Cocktail Bar to a Full-Service Restaurant (5,400 SF)
7 day - interior remodel of existing restaurant with new kitchen equipment, hood and grease trap. - o
Qt - 1411 sqft floor remidiation. remodel of 2 bedroom condo to remove and reinstall hardwood flooring, replace all kitchen cabinets, uninstall and reinstall kitchen…
Tenant finish out of an existing lease space for a restaurant
water restoration post flood-drywall, paint, cabinetry, flooring, in kitchen. No sq ft changes
Change of Use for Existing Retail space to Allow for Alcohol/Food Sales. (2960 SF)
Interior tenant improvement for a 3680 SF restaurant with outdoor seating in an existing to a multi-tenant building within the Lamar Union Plaza
INTERIOR REMODEL & CHANGE OF USE FROM RETAIL TO BAR & 717 SF EXTERIOR PATIO ADDITION. See SPC 2024-0021A CUP
Includes reorganization of existing kitchen equipment and addition of new fryer units. The existing type 1 hood and wrapped ducts will be replaced with type1 new equipment. Rooftop equipment will remain existing.
Interior renovation to the existing kitchen serving the residential facility along with the replacement of the grease interceptor. Scope includes abatement of hazardous materials new floor wall and ceiling finishes. Limited modification of the existing HVAC…
+38 more plan review cases in the full issue
+51 more issued permits in the full issue
How fit is scored for kitchen and food-service equipment work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit food-service wording (kitchen, restaurant, cafe, bar, hood, walk-in cooler). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Apr 6–12, 2026.
Start Your Free Trial7 commercial projects in city plan review and 9 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 7 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior remodel of an existing restaurant/retail to include finishes and new equipment connections. VERIFY NO MECHANICAL WORK VERIFY NO ELECTRICAL WORK
Indoor above-ground pool deck, shower, toilet for indoor swim school
Change of Use personal services to Medical - 2,880 SF new build-out of existing shell space construction to include: interior walls, floors finishes, interior doors,…
7 DAY - Remodel in existing office to modify existing exit access stairs between floor 3-5. Please note PPR Minutes included in this submittal - OVA
Roof Replacement for Retail Building
1st gen shell finish out for restaurant.
Interior only renovation of existing 1078 sf coffee shop.
Interior Remodel of Existing Business Office (23203 SF)
ePlan Review: Demising wall to create suite 1302 added per revision 3
Remodeling 4 existing office areas into 4 new garages.
+2 more plan review cases in the full issue
+4 more issued permits in the full issue
How fit is scored for kitchen and food-service equipment work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit food-service wording (kitchen, restaurant, cafe, bar, hood, walk-in cooler). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Apr 10, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Kitchen Equipment) |
|---|---|---|---|---|---|
| Plan Review | Restaurant remodel | Remodel | N/A | 1809 Manor LLC | Medium |
| Plan Review | School remodel | Remodel | $120K est. (TDLR filing) | Bleyl Engineering | Low |
| Plan Review | Change of use to medical clinic | Remodel | $500K est. (TDLR filing) | BASIC Group P.E.I. | Low |
| Plan Review | Office space remodel | Remodel | $701K est. (TDLR filing) | WGI | Low |
| Plan Review | Retail space remodel | Remodel | N/A | BlueTeam Roofing | Low |
| Issued Permit | Restaurant remodel | Remodel | $250K est. (TDLR filing) | KBGE Part of Civil & Environmental Consultants | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.