1. Commercial remodel
Construction of new dumpster enclosure in existing parking lot. SPE approved
No company contact in the City data beyond the permit expediter.
From Monday, Apr 6 through Sunday, Apr 12, 2026, 43 commercial projects entered or moved through City of Austin plan review and 56 commercial building permits were issued. 4 plan review cases and 10 issued permits rate Strong or Medium for Concrete / Foundation work.
This archived issue is ranked for Concrete / Foundation work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Apr 10.
43 commercial projects in city plan review and 56 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 42 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Construction of new dumpster enclosure in existing parking lot. SPE approved
Interior Remodel to Existing Convenience Store, Scope of Work to Include New Addition to Existing Building (3736 SF)
New Electrical Building for the Walnut Creek WWTP Influent Lift Station.
New construction of a 668 sqft Scooter's Coffee kiosk drive-thru.
Exterior facade remodel of existing retail strip center. No modifications being made to any site work, landscape, building envelopes, interiors or occupancies
Conversion of an existing parking lot into an EV Charging fleet site including prefab restroom building. Installation of fence to surround EV charging fleet site.
Re-roof tear off existing built-up roof to lightweight insulated concrete deck (R16) and install 2.2 polyiso insulation (R12) & TPO membrane. The LWIC and Polyiso insulation will meet 2021 IECC R25 code requirement
New Fountain Foundation
7 DAY - Demo end of life UPS systems and replace with new like and kind UPS. no exterior or site work. Existing business building. - OVA
QT - REMOVE AND REPLACE EXISTING DUMPSTER ENCLOSURE SIZE FOR SIZE. ADD NEW 10X20 CONCRETE PAD/WALLS FOR ADDITIONAL DUMPSTER/RECYCLING/COMPOSTING - OVA
+38 more plan review cases in the full issue
+51 more issued permits in the full issue
How fit is scored for concrete and foundation work: points for size (square feet), scope (new buildings, shells and additions score highest, site and paving work next, interior remodels lowest) and explicit concrete wording (foundation, slab, piers, tilt-wall, post-tension, paving, parking garage, sidewalks, retaining walls, site work). Strong needs a new building, shell or addition of 10,000+ SF or explicit concrete scope; interior finish-outs rate Low; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Apr 6–12, 2026.
Start Your Free Trial7 commercial projects in city plan review and 9 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 7 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Change of Use personal services to Medical - 2,880 SF new build-out of existing shell space construction to include: interior walls, floors finishes, interior doors,…
Indoor above-ground pool deck, shower, toilet for indoor swim school
7 DAY - Remodel in existing office to modify existing exit access stairs between floor 3-5. Please note PPR Minutes included in this submittal - OVA
Roof Replacement for Retail Building
Repairs to existing staircase replacement of stucco cladding, wood stud wall framing, new hardware to support floor trusses, water proofing repairs
Interior Remodel of Existing Business Office (23203 SF)
ePlan Review: Demising wall to create suite 1302 added per revision 3
Remodeling 4 existing office areas into 4 new garages.
Interior Alteration of an Existing Office Space
AT&T Mobility Upgrade of equipment on an existing cell phone rooftop facility.
+2 more plan review cases in the full issue
+4 more issued permits in the full issue
How fit is scored for concrete and foundation work: points for size (square feet), scope (new buildings, shells and additions score highest, site and paving work next, interior remodels lowest) and explicit concrete wording (foundation, slab, piers, tilt-wall, post-tension, paving, parking garage, sidewalks, retaining walls, site work). Strong needs a new building, shell or addition of 10,000+ SF or explicit concrete scope; interior finish-outs rate Low; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Apr 10, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Concrete / Foundation) |
|---|---|---|---|---|---|
| Plan Review | Change of use to medical clinic | Remodel | $500K est. (TDLR filing) | BASIC Group P.E.I. | Low |
| Plan Review | School remodel | Remodel | $120K est. (TDLR filing) | Bleyl Engineering | Low |
| Plan Review | Office space remodel | Remodel | $701K est. (TDLR filing) | WGI | Low |
| Plan Review | Retail space remodel | Remodel | N/A | BlueTeam Roofing | Low |
| Plan Review | Commercial remodel | Remodel | N/A | IMP Eleven LLC | Low |
| Issued Permit | Office space remodel | Remodel | N/A | R.L. Hicks L.P. | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.