1. Office space remodel
15 day - multi-level demo and remodel of administrative office space, phase 2
From Monday, Apr 6 through Sunday, Apr 12, 2026, 43 commercial projects entered or moved through City of Austin plan review and 56 commercial building permits were issued. 0 plan review cases and 3 issued permits rate Strong or Medium for Demolition work.
This archived issue is ranked for Demolition work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Apr 10.
43 commercial projects in city plan review and 56 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 42 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
15 day - multi-level demo and remodel of administrative office space, phase 2
Change of Use personal services to Medical - 2,880 SF new build-out of existing shell space construction to include: interior walls, floors finishes, interior doors,…
Interior Remodel to Existing Convenience Store, Scope of Work to Include New Addition to Existing Building (3736 SF)
Change of Use from Cocktail Bar to a Full-Service Restaurant (5,400 SF)
7 day - interior remodel of existing restaurant with new kitchen equipment, hood and grease trap. - o
Selective demolition and replacement of pool plaza concrete topping; new waterproofing membrane.
7 DAY - Demo end of life UPS systems and replace with new like and kind UPS. no exterior or site work. Existing business building. - OVA
Interior renovation to the existing kitchen serving the residential facility along with the replacement of the grease interceptor. Scope includes abatement of hazardous materials new floor wall and ceiling finishes. Limited modification of the existing HVAC…
Interior Remodel level 1 for sectors 3 6 and 7. Level 2 - Sectors 3 6. (96600SF). Interior Remodel of Sector 3- Level 1- Shipping Sector 7- Floors 2-4 (65700 SF).
CHANGE OF USE OFFICE TO PRIMARY EDUCATION (SECONDARY EDUCATION) Interior renovation of approx 43830 SF of an existing 3 story 66360 SF office bldg to accommodate a private educational facility. Scope includes new walls ceilings and finishes with the addition…
+38 more plan review cases in the full issue
+51 more issued permits in the full issue
How fit is scored for demolition work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit demolition wording (demolition, abatement, removal of existing). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Apr 6–12, 2026.
Start Your Free Trial7 commercial projects in city plan review and 9 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 7 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
15 day - multi-level demo and remodel of administrative office space, phase 2
Change of Use personal services to Medical - 2,880 SF new build-out of existing shell space construction to include: interior walls, floors finishes, interior doors,…
Interior remodel of an existing restaurant/retail to include finishes and new equipment connections. VERIFY NO MECHANICAL WORK VERIFY NO ELECTRICAL WORK
Indoor above-ground pool deck, shower, toilet for indoor swim school
7 DAY - Remodel in existing office to modify existing exit access stairs between floor 3-5. Please note PPR Minutes included in this submittal - OVA
Interior Remodel of Existing Business Office (23203 SF)
Interior Alteration of an Existing Office Space
ePlan Review: Demising wall to create suite 1302 added per revision 3
Remodeling 4 existing office areas into 4 new garages.
Interior remodel of existing residential condo space. No structural modifications proposed refer to SOW attached to application.
+2 more plan review cases in the full issue
+4 more issued permits in the full issue
How fit is scored for demolition work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit demolition wording (demolition, abatement, removal of existing). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Apr 10, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Demolition) |
|---|---|---|---|---|---|
| Plan Review | Office space remodel | Remodel | N/A | JDAI Studio | Low |
| Plan Review | Change of use to medical clinic | Remodel | $500K est. (TDLR filing) | BASIC Group P.E.I. | Low |
| Plan Review | Restaurant remodel | Remodel | N/A | 1809 Manor LLC | Low |
| Plan Review | School remodel | Remodel | $120K est. (TDLR filing) | Bleyl Engineering | Low |
| Plan Review | Office space remodel | Remodel | $701K est. (TDLR filing) | WGI | Low |
| Issued Permit | Office space remodel | Remodel | N/A | R.L. Hicks L.P. | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.