1. Change of use to primary education
CHANGE OF USE OFFICE TO PRIMARY EDUCATION (SECONDARY EDUCATION) Interior renovation of approx 43,830 SF of an existing 3 story 66,360 SF office bldg to accommodate a…
From Monday, Jan 26 through Sunday, Feb 1, 2026, 35 commercial projects entered or moved through City of Austin plan review and 31 commercial building permits were issued. 4 plan review cases and 5 issued permits rate Strong or Medium for Electrical work.
This archived issue is ranked for Electrical work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Jan 30.
35 commercial projects in city plan review and 31 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 25 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
CHANGE OF USE OFFICE TO PRIMARY EDUCATION (SECONDARY EDUCATION) Interior renovation of approx 43,830 SF of an existing 3 story 66,360 SF office bldg to accommodate a…
Interior Alteration of an Existing UPS Store for Suite 300 - Approved
New Apartments, to Include Leasing, Mail, Conversation Lounge, Hospitality Kitchen, Market, Co-Work, TV Lounge, Parking Garage with Amenity (Fitness,
New Retail / Office below and apartments above
First time interior finish out of office suite for Alamo Drafthouse business headquarters office with Access Control Requested and minor MEP work
Interior renovations from retail grocery to fitness center including mechanical electrical and plumbing.
Interior finish out for Mattress Firm in existing single story retail space. Scope includes electrical mechanical and plumbing.
7 DAY - Add a new lighting circuit and 3 new 208/1 phase circuits in sector 110 on existing office space. OVA
QT - Interior remodel plumbing and electrical pmts rqd. - OVA
New Construction of Pre-Fab Metal Maintenance building with all Associated MEP and Flat work on Existing site. (13000) New Construction of Covered Wash Bay. New Construction of Covered Equipment Area.
+30 more plan review cases in the full issue
+26 more issued permits in the full issue
How fit is scored for electrical work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (labs, data, medical, hotels, grocery and industrial carry the most electrical load) and explicit electrical wording (service upgrade, switchgear, transformer, generator, EV charging, lighting, solar). Strong needs real size (20,000+ SF) or explicit electrical scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Jan 26–Feb 1, 2026.
Start Your Free Trial9 commercial projects in city plan review and 7 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 7 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
New Retail / Office below and apartments above
Replace tile, plumbing fixtures, and lighting fixtures, new countertop
First Time Finish out for Convenience Store with Kitchen (9,000 SF)
Repair of water damage following a fire extinguished on the upper floor of an existing multi-family apartment building. This project scope includes replacement of…
QT - Installing a stand alone mini split in server room in existing business space - OVA
New Construction two story building on previously undisturbed site; part Business (offices) and part Education (daycare).
7 DAY - INTERIOR ALTERATOIN OF APPROX. (4475SF) OF EXISTING INTERIOR ADMIN SPACE
7 DAY - INTERIOR ALTERATION OF EXISTING OFFICE SPACE
Interior and exterior renovation of an existing restaurant addition of a second drive-thru lane.
7 DAY - Adding x-ray machine to existing medical office - OVA
+4 more plan review cases in the full issue
+2 more issued permits in the full issue
How fit is scored for electrical work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (labs, data, medical, hotels, grocery and industrial carry the most electrical load) and explicit electrical wording (service upgrade, switchgear, transformer, generator, EV charging, lighting, solar). Strong needs real size (20,000+ SF) or explicit electrical scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Jan 30, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Electrical) |
|---|---|---|---|---|---|
| Plan Review | 2-story apartment building | New | $1.6M | N/A | Medium |
| Plan Review | Commercial remodel | Remodel | $300K est. (TDLR filing) | Kopfer Taylor Interiors | Low |
| Plan Review | Convenience store remodel | Remodel | $150K est. (TDLR filing) | Professional StruCIVIL Engineers, Inc | Low |
| Plan Review | Apartment building remodel | Remodel | N/A | Beavers Design | Low |
| Plan Review | Commercial remodel | Remodel | $261K est. (TDLR filing) | N/A | Low |
| Issued Permit | 2-story daycare | New | $2.0M | Spawglass Contractors Inc | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.