1. 2-story apartment building
New Retail / Office below and apartments above
From Monday, Jan 26 through Sunday, Feb 1, 2026, 35 commercial projects entered or moved through City of Austin plan review and 31 commercial building permits were issued. 4 plan review cases and 6 issued permits rate Strong or Medium for Glazing / Storefront work.
This archived issue is ranked for Glazing / Storefront work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Jan 30.
35 commercial projects in city plan review and 31 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 25 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
New Retail / Office below and apartments above
New construction of a free standing single story shell building address used to be 3101 E YAGER LANE Bldg 3
Level 2 Interior Remodel of Existing Small Kitchen and Wellness Area. Level 3 Exterior Remodel of an Existing Pool Bar Area and Addition of New Roof Are
New Apartments, to Include Leasing, Mail, Conversation Lounge, Hospitality Kitchen, Market, Co-Work, TV Lounge, Parking Garage with Amenity (Fitness,
CHANGE OF USE OFFICE TO PRIMARY EDUCATION (SECONDARY EDUCATION) Interior renovation of approx 43,830 SF of an existing 3 story 66,360 SF office bldg to accommodate a…
New Construction two story building on previously undisturbed site; part Business (offices) and part Education (daycare).
New Construction of Pre-Fab Metal Maintenance building with all Associated MEP and Flat work on Existing site. (13000) New Construction of Covered Wash Bay. New Construction of Covered Equipment Area.
Installation of fourteen (14) 40x8 intermodal shipping containers 12 of which will be connected via pre-engineered pre-manufactured roof systems (3 roof systems connecting 4 containers each 2 free standing containers) PuPR2
New Ground up facility of approximately 950 sq feet for general sales of coffee and pre-packaged items. 2024 058767 SP - Concurrent Review
Sewer Pump Replacement
+30 more plan review cases in the full issue
+26 more issued permits in the full issue
How fit is scored for glazing and storefront work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit glazing wording (storefront, curtain wall, glazing, windows, facade). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Jan 26–Feb 1, 2026.
Start Your Free Trial9 commercial projects in city plan review and 7 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 7 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
New Retail / Office below and apartments above
First Time Finish out for Convenience Store with Kitchen (9,000 SF)
Swimming pool remodel
Proposed new amenity at the Sonora Condo community, to include a pool, bathrooms and an outdoor patio. The pool was approved separately (2 APPS)
QT - Installing a stand alone mini split in server room in existing business space - OVA
New Construction two story building on previously undisturbed site; part Business (offices) and part Education (daycare).
Interior and exterior renovation of an existing restaurant addition of a second drive-thru lane.
7 DAY - INTERIOR ALTERATOIN OF APPROX. (4475SF) OF EXISTING INTERIOR ADMIN SPACE
7 DAY - INTERIOR ALTERATION OF EXISTING OFFICE SPACE
7 DAY - Adding x-ray machine to existing medical office - OVA
+4 more plan review cases in the full issue
+2 more issued permits in the full issue
How fit is scored for glazing and storefront work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit glazing wording (storefront, curtain wall, glazing, windows, facade). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Jan 30, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Glazing / Storefront) |
|---|---|---|---|---|---|
| Plan Review | 2-story apartment building | New | $1.6M | N/A | Medium |
| Plan Review | Convenience store remodel | Remodel | $150K est. (TDLR filing) | Professional StruCIVIL Engineers, Inc | Low |
| Plan Review | Commercial remodel | Remodel | N/A | All Clear Pools | Low |
| Plan Review | Clubhouse remodel | Remodel | $150K est. (TDLR filing) | N/A | Low |
| Plan Review | Commercial remodel | Remodel | $261K est. (TDLR filing) | N/A | Low |
| Issued Permit | 2-story daycare | New | $2.0M | Spawglass Contractors Inc | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.