1. Office space remodel
Interior Remodel to Existing Office Space, Access Control Requested (10,870 SF)
From Monday, Oct 26 through Sunday, Nov 1, 2026, 118 commercial projects entered or moved through City of Austin plan review and 70 commercial building permits were issued. 10 plan review cases and 8 issued permits rate Strong or Medium for Low-Voltage / Security work.
This archived issue is ranked for Low-Voltage / Security work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Oct 30.
118 commercial projects in city plan review and 70 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 46 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior Remodel to Existing Office Space, Access Control Requested (10,870 SF)
New Construction of Apartment Complex (58,777 SF)
New construction of a two-story manufacturing facility consisting of a main factory (1,220,632 SF) with an attached two-story office (
New construction of a four-story, approx. 48,000 SF worship assembly building for Grace Covenant Church, to replace an existing 1-story building being demolished, plus…
Interior Remodel and Change of Use from Personal Services to Pet Services (250,000 SF)
New Construction of Multi Family Building (24946 SF). New Construction of Multi Family Buildings with Private Garages (8781 SF). New Construction of Multi Family Apartments (24992 SF). New Construction of Multi Family Buildings with Private Garages (38520…
Addition and Remodel to Existing Admin Office Building to Create Visitors Center and Office (42552 SF). New Construction of Accessory Building for Landscape Viewing (1530 SF). New Construction of an Accessory Restroom Building (2605 SF). New Construction…
Level 2 renovation includes reduction of tenant suite; removing existing workstations and replacing with new furniture new offices mechanical branch ductwork to be relocated as needed for new layout; electrical circuit.
Change of use from B (Admin/ Professional Offices) to Education for private school use.
Interior Remodel to Existing Hotel 1st Floor Common Areas. Interior Remodel to Existing Hotel to Create Retail Shell (LRG). Interior Remodel to Existing Hotel to Create Retail Shell (small). Interior Remodel to Existing Hotel to Create Accessory…
+113 more plan review cases in the full issue
+65 more issued permits in the full issue
How fit is scored for low-voltage and security work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (offices, labs, medical and hotels carry the most low-voltage) and explicit low-voltage, access control or cabling wording. Strong needs real size or explicit scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Oct 26–Nov 1, 2026.
Start Your Free Trial89 commercial projects in city plan review and 9 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 4 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
New construction of a four-story, approx. 48,000 SF worship assembly building for Grace Covenant Church, to replace an existing 1-story building being demolished, plus…
Interior Remodel and Change of Use from Personal Services to Pet Services (250,000 SF)
Subdivide open area into 4 offices with a corridor, an AV training room, and the rest of the space will remain an open area
Construct new canopy, new C-Store with kitchen, new car wash, construct new trash enclosure. (4 Apps)
New Construction of Community Hall Building (1,549 SF)
Change of use from B (Admin/ Professional Offices) to Education for private school use.
New commercial construction of an 128 sq ft natural pool (outdoor) 168 sq ft hot tub (indoor) 265 sq ft flotation pool (indoor) and 53 sq ft cold plunge (indoor) all on level 1 for multi-family use at 6th & Blanco Hotel. New construction of a 588 square foot…
Finish out for admin office.
INTERIOR ALTERATION OF AN EXISTING OFFICE AND ASSEMBLY SPACE.
2026/11/20 - 2027/01/06 | (2026/11/02) | Four Seasons - Ice Rodeo - Annual ice rink being built at the Four Seasons Austin for the holiday season.
+84 more plan review cases in the full issue
+4 more issued permits in the full issue
How fit is scored for low-voltage and security work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (offices, labs, medical and hotels carry the most low-voltage) and explicit low-voltage, access control or cabling wording. Strong needs real size or explicit scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Oct 30, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Low-Voltage / Security) |
|---|---|---|---|---|---|
| Plan Review | 4-story church | New | $25.0M | FGM Architects | Medium |
| Plan Review | Change of use to pet services | Remodel | N/A | N/A | Medium |
| Plan Review | Office space remodel | Remodel | $150K est. (TDLR filing) | Stouse Design LLC | Medium |
| Plan Review | Convenience store with car wash | New | $6.0M | Professional StruCIVIL Engineers, Inc | Medium |
| Plan Review | Community hall building | New | $100K est. (TDLR filing) | LJA Engineering, Inc | Medium |
| Issued Permit | Change of use to school | Remodel | N/A | Husch Blackwell LLP | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.