1. 5-story hotel
Proposed construction of a new five-story hotel utilizing type ii-a construction over a traditional slab on grade concrete foundation
From Monday, Oct 19 through Sunday, Oct 25, 2026, 127 commercial projects entered or moved through City of Austin plan review and 65 commercial building permits were issued. 15 plan review cases and 6 issued permits rate Strong or Medium for Low-Voltage / Security work.
This archived issue is ranked for Low-Voltage / Security work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Oct 23.
127 commercial projects in city plan review and 65 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 45 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Proposed construction of a new five-story hotel utilizing type ii-a construction over a traditional slab on grade concrete foundation
Interior Remodel to Existing Office Space, Access Control Requested (10,870 SF)
New Construction of Apartment Complex (58,777 SF)
Remodel of existing building and New construction addition to create a Mixed Use MF building. 102,878 SF of R occupancy among 27 dwelling units; with accessory uses of…
285,000 SF Ground-up construction of a Warehouse with associated site improvements and parking
Phase 1: Interior remodel of the existing office suite. This is an occupied remodel. Suite 250 Phase 2 will remain occupied while Phase 1 is under construction. Existing access control is to remain. Suite 250
Interior remodel to existing admin office including access control and associate MEP scopes. No change of use.
New Construction of Austin Convention Center - Areas 1, 2, 3 and 4.
New Construction of Sports Facility - Transformer Pad.
Texas Capital is only taking half of floor 16. This will consist of offices & open office space and a beverage bar. Suite 1700 is a full floor tenant suite. Consisting of Client Center Financial center and work area for employees.
+122 more plan review cases in the full issue
+60 more issued permits in the full issue
How fit is scored for low-voltage and security work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (offices, labs, medical and hotels carry the most low-voltage) and explicit low-voltage, access control or cabling wording. Strong needs real size or explicit scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Oct 19–25, 2026.
Start Your Free Trial77 commercial projects in city plan review and 10 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 6 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior Remodel to Existing Office Space, Access Control Requested (10,870 SF)
New Construction of Apartment Complex (58,777 SF)
Change of use from B (Admin/ Professional Offices) to Education for private school use. ATTN ELEC INSP Revised Panel Schedule and Load Calculation Required
Replace interior flooring throughout, replace plumbing fixtures, replace 2 storefront windows, fix exterior drainage issues, envelope maintenance, and minor electrical…
Replacement of existing floor-mounted Water Source Heat Pump (WSHP) units with new ceiling-mounted horizontal WSHP units throughout Building A including associated…
Phase 1: Interior remodel of the existing office suite. This is an occupied remodel. Suite 250 Phase 2 will remain occupied while Phase 1 is under construction. Existing access control is to remain. Suite 250
Interior Remodel to Existing Admin Office Areas Phase 2-1B Admin Areas (2200 SF). Interior Remodel to Existing Admin Office Areas Phase 2-2 2nd Floor Areas (14900 SF). Interior Remodel to Existing Admin Office Areas Phase 2-3A 3rd Floor Small Restroom (275…
7 DAY - This permit is for suite 950 only. This is an office finish out with offices conference rooms phone rooms open off
2026/10/22 - 2026/10/25 | The Pinnacle of Motorsports returns to COTA.
New construction of a multifamily development consisting of - Building 1: Four-story apartment building with 176 dwelling units. New construction of a multifamily development consisting of - Building 2: Apartment building with 60 dwelling units. New…
+72 more plan review cases in the full issue
+5 more issued permits in the full issue
How fit is scored for low-voltage and security work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (offices, labs, medical and hotels carry the most low-voltage) and explicit low-voltage, access control or cabling wording. Strong needs real size or explicit scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Oct 23, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Low-Voltage / Security) |
|---|---|---|---|---|---|
| Plan Review | Office space remodel | Remodel | N/A | Interior Architects | Strong |
| Plan Review | Apartment complex | New | $11.8M | 3423 INVESTMENTS LLC & MF AUSTIN RIDGE LLC | Medium |
| Plan Review | Change of use to school | Remodel | N/A | Husch Blackwell LLP | Medium |
| Plan Review | School electrical remodel (Round Rock ISD) | Remodel | $3.6M est. (TDLR filing) | ROUND ROCK ISD | Medium |
| Plan Review | School HVAC remodel (Austin ISD) | Remodel | $227K est. (TDLR filing) | AUSTIN INDEPENDENT SCHOOL DISTRICT | Medium |
| Issued Permit | Office space remodel | Remodel | $5.8M est. (TDLR filing) | Novo Construction | Strong |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.