1. Industrial building shell
Ground-up construction of a 409,078 square-foot, single-story tilt-wall shell building designed as a cold dark shell for future tenant build-out. Building 2…
From Monday, Sep 21 through Sunday, Sep 27, 2026, 46 commercial projects entered or moved through City of Austin plan review and 36 commercial building permits were issued. 1 plan review case and 0 issued permits rate Strong or Medium for Elevator work.
This archived issue is ranked for Elevator work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Sep 25.
46 commercial projects in city plan review and 36 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 24 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Ground-up construction of a 409,078 square-foot, single-story tilt-wall shell building designed as a cold dark shell for future tenant build-out. Building 2…
First Time Finish Out for Factory/Warehouse (59,375 SF)
Ground-up construction of a 136,145-square-foot, single-story tilt-wall shell building designed as a cold dark shell for future tenant build-out. Building 1…
Lift Station Improvements- New pumps, wet well, valve vault and electrical improvements
Renovation of 18206 SF of the 2nd Floor of the Travis County BCPWP Wilson Parke Building; includes select demolition, new metal stud and gypboard walls, doors and…
Installation of a new lift station in an existing hospital.
Reroof - emergency department and postpartum. Existing hospital.
Tenant improvement to existing space (formerly CVS) for Dollar Tree. Scope includes updating finishes and fixtures New RTUs at existing locations and MEP work as needed.
Installation of a new RTU to provide cooling and ventilation for the packing are of the existing tortilla manufacturing facility.
Repairs to building 9 patio walls stairs walkway. Structural repairs to BLDG 9 including repair/replacement of damaged patio wall framing repair of steel courtyard stairs and installation of new footings and replacement of damaged elevated courtyard walkway…
+41 more plan review cases in the full issue
+31 more issued permits in the full issue
How fit is scored for elevator work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit elevator wording (elevator, lift, escalator). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Sep 21–27, 2026.
Start Your Free Trial7 commercial projects in city plan review and 3 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 3 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Lift Station Improvements- New pumps, wet well, valve vault and electrical improvements
New construction of 2,688 sf fuel canopy (24'-0" x 112'-0") with four (4) multi-product fuel dispensers. work includes canopy structure, foundations, framing,…
Combining 3 Unit spaces into 1
Relocated washing machine to upstairs (3rd Floor) closet. Waterline and drain line were extended to reach 2nd floor. Electrical work was performed to add a power outlet…
New power and data in existing office. New exterior lighting
Fire Rebuild for a portion of existing apartment building 2026-070612 DA - Approved
Change of use to admin/business office and small tenant improvement project renovate break room and bathroom change out lighting throughout.
COTAland Paddock Pedestrian Bridge.
+2 more plan review cases in the full issue
How fit is scored for elevator work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit elevator wording (elevator, lift, escalator). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Sep 25, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Elevator) |
|---|---|---|---|---|---|
| Plan Review | Commercial remodel | Remodel | N/A | N/A | Low |
| Plan Review | New building | New | $100K | Fortune One Development LLC | Low |
| Plan Review | Commercial remodel | Remodel | $125K est. (TDLR filing) | N/A | Low |
| Plan Review | Commercial remodel | Remodel | N/A | N/A | Low |
| Plan Review | Office space remodel | Remodel | $411K est. (TDLR filing) | Linbeck Group, LLC | Low |
| Issued Permit | Apartment building remodel | Remodel | N/A | Camp Facility Services | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.