1. Commercial remodel
Renovation of 18206 SF of the 2nd Floor of the Travis County BCPWP Wilson Parke Building; includes select demolition, new metal stud and gypboard walls, doors and…
From Monday, Sep 21 through Sunday, Sep 27, 2026, 46 commercial projects entered or moved through City of Austin plan review and 36 commercial building permits were issued. 4 plan review cases and 1 issued permit rate Strong or Medium for Demolition work.
This archived issue is ranked for Demolition work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Sep 25.
46 commercial projects in city plan review and 36 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 24 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Renovation of 18206 SF of the 2nd Floor of the Travis County BCPWP Wilson Parke Building; includes select demolition, new metal stud and gypboard walls, doors and…
Interior remodel/finish out: demo of exst admin offices for new yoga studio room, with addition of small food prep area near reception
INTERIOR REMODEL - EXISTING OFFICE SPACE, DEMO, FINISHES AND MEP AS SHOWN ON THE PLANS. As of September 1st, 2026, the City of Austin has adopted the 2026 NEC. Projects…
Change Of Use From Retail to Educational, interior non structural demolition of existing wall partitions and relocating of existing outlets
First Time Finish Out for Factory/Warehouse (59,375 SF)
PARTIAL DEMOLITION OF WALLS CEILINGS HVAC & LIGHTING EQUIP. BUILD NEW WALLS INSTALL NEW HVAC LIGHTING NEW FIXTURES CABINETS ETC. RE-USE EXISTING BATHROOMS.
Reroof - emergency department and postpartum. Existing hospital.
Tenant improvement to existing space (formerly CVS) for Dollar Tree. Scope includes updating finishes and fixtures New RTUs at existing locations and MEP work as needed.
Installation of a new RTU to provide cooling and ventilation for the packing are of the existing tortilla manufacturing facility.
Repairs to building 9 patio walls stairs walkway. Structural repairs to BLDG 9 including repair/replacement of damaged patio wall framing repair of steel courtyard stairs and installation of new footings and replacement of damaged elevated courtyard walkway…
+41 more plan review cases in the full issue
+31 more issued permits in the full issue
How fit is scored for demolition work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit demolition wording (demolition, abatement, removal of existing). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Sep 21–27, 2026.
Start Your Free Trial7 commercial projects in city plan review and 3 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 3 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior remodel existing College areas. admin/ classroom areas
New construction of 2,688 sf fuel canopy (24'-0" x 112'-0") with four (4) multi-product fuel dispensers. work includes canopy structure, foundations, framing,…
Lift Station Improvements- New pumps, wet well, valve vault and electrical improvements
Combining 3 Unit spaces into 1
Relocated washing machine to upstairs (3rd Floor) closet. Waterline and drain line were extended to reach 2nd floor. Electrical work was performed to add a power outlet…
Fire Rebuild for a portion of existing apartment building 2026-070612 DA - Approved
Change of use to admin/business office and small tenant improvement project renovate break room and bathroom change out lighting throughout.
COTAland Paddock Pedestrian Bridge.
+2 more plan review cases in the full issue
How fit is scored for demolition work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit demolition wording (demolition, abatement, removal of existing). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Sep 25, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Demolition) |
|---|---|---|---|---|---|
| Plan Review | Office space remodel | Remodel | $500K est. (TDLR filing) | N/A | Low |
| Plan Review | New building | New | $100K | Fortune One Development LLC | Low |
| Plan Review | Commercial remodel | Remodel | N/A | N/A | Low |
| Plan Review | Commercial remodel | Remodel | $125K est. (TDLR filing) | N/A | Low |
| Plan Review | Commercial remodel | Remodel | N/A | N/A | Low |
| Issued Permit | Apartment building remodel | Remodel | N/A | Camp Facility Services | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.