1. Multifamily shell building
New Construction of Shell- Scope of Work to Include Multi Family Res. Shell and Tenant Finish out 1st Floor Multifamily and Amenity sp
Permit expediter: KS Permitting LLC
From Monday, Aug 10 through Sunday, Aug 16, 2026, 56 commercial projects entered or moved through City of Austin plan review and 49 commercial building permits were issued. 8 plan review cases and 11 issued permits rate Strong or Medium for HVAC / Mechanical work.
This archived issue is ranked for HVAC / Mechanical work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Aug 14.
56 commercial projects in city plan review and 49 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 38 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
New Construction of Shell- Scope of Work to Include Multi Family Res. Shell and Tenant Finish out 1st Floor Multifamily and Amenity sp
Single suite renovation at existing medical office building. Reconfiguration of floor plan including installation of new finishes and reorganization of mechanical systems
Interior Remodel to Existing Restaurant Scope of Work Include Interior and Storefront Remodel (21,500 SF)
Install mini split system in existing restaurant
Upgrading existing kitchen from type 2 to type 1. more specifically grease hood, exhaust fan and makeup air also insulation of new ansul suppression system
Scope includes providing new wall finishes new lighting fixtures new kitchen area and interior walls storefronts for office use. Scope will include mechanical electrical and plumbing upgrades.
62435 SF ground up new light manufacturer. Project will be structural steel tilt wall construction with associated site work and interior finish out. New Dumpster Enclosure for New Light Manufacturing Facility. (323 sq ft)
Finish out for Light Manufacturing for Bldg. 3
Finish Out for Hotel Rooms Housekeeping Hydration station and Electrical/IDF Room Floor 9 Finish Out for Hotel Rooms Housekeeping Hydration station and Electrical/IDF Room Floor 10 Finish Out for Hotel Rooms Housekeeping Hydration station and Electrical/IDF…
Change of Use for new daycare Acorns To Oaks (ATO) at existing 3-story building located at Austin Oaks Church campus from Groups B/A-3 to Groups I-4/E/A-3. No construction work in scope.
+51 more plan review cases in the full issue
+44 more issued permits in the full issue
How fit is scored for HVAC work: points for size (square feet), scope (new buildings, additions and finish-outs score highest, small remodels lowest), occupancy (labs, medical, hotels, restaurants, schools and assembly carry the most HVAC load) and explicit HVAC wording (RTU, chiller, ductwork, exhaust, VRF, AHU). Strong needs real size (12,000+ SF) or explicit HVAC scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Aug 10–16, 2026.
Start Your Free Trial13 commercial projects in city plan review and 5 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 3 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior tenant build-out of an existing vacant restaurant space for a Firehouse Subs quick-service restaurant; includes architectural, MEP, kitchen equipment and…
New Substation 4 C71 Electrical Building at Walnut Creek WWTP
Partial demolition of walls, ceilings, hvac & lighting equip. build new walls, install new hvac, lighting new fixtures, cabinets, etc. re-use existing bathrooms
Interior Remodel and Change of Use from Historic Home to Restaurant. Scope of Work to include Remodel of an Existing Historic house (3,054 SF) and adding on a Glas
Interior tenant improvement to existing commercial office space. Install one new sink connected to existing plumbing and add electrical receptacles. No structural…
Minot remodel of existing tenant space to demo existing interior improvements relocate doors add 6 new electrical J box whips to new furniture and update access control from previous expired permit. No plumbing or mech scope
Smart Housing Project - remodel and addition to existing historic bldg to convert to 30 resd units comprised of 14415 sqft of remodel space + 1805 sf porch area (remodel space) + and 6870 sqft of new construction + 23090 sqft. (Building 1) Smart Housing…
New Parking Garage/Sprink
Relocation of 5 existing portables on the existing school campus site.
Interior Remodel to Existing Warehouse Office
+8 more plan review cases in the full issue
How fit is scored for HVAC work: points for size (square feet), scope (new buildings, additions and finish-outs score highest, small remodels lowest), occupancy (labs, medical, hotels, restaurants, schools and assembly carry the most HVAC load) and explicit HVAC wording (RTU, chiller, ductwork, exhaust, VRF, AHU). Strong needs real size (12,000+ SF) or explicit HVAC scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Aug 14, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (HVAC / Mechanical) |
|---|---|---|---|---|---|
| Plan Review | Restaurant remodel | Remodel | $400K est. (TDLR filing) | N/A | Medium |
| Plan Review | Substation electrical building, Walnut Creek WWTP | New | N/A | Atlas Design Services | Medium |
| Plan Review | Commercial remodel | Remodel | N/A | Knight Group Architecta | Low |
| Plan Review | Change of use to restaurant | Addition and Remodel | $1.0M | SoCo Legacy LLC dba Todd House LLC | Low |
| Plan Review | Office space remodel | Remodel | $264K est. (TDLR filing) | 1023 Holdings, LLC | Low |
| Issued Permit | Commercial remodel | Remodel | N/A | HRNCIR Construction, LP | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.