1. 30-story multifamily shell with garage
New Construction of Shell for Multi-Family Building, First Time Finish out For Floors 1-30, and New Parking Garage (557,099 SF)
From Monday, Jul 27 through Sunday, Aug 2, 2026, 43 commercial projects entered or moved through City of Austin plan review and 55 commercial building permits were issued. 4 plan review cases and 1 issued permit rate Strong or Medium for Glazing / Storefront work.
This archived issue is ranked for Glazing / Storefront work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Jul 31.
43 commercial projects in city plan review and 55 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 43 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
New Construction of Shell for Multi-Family Building, First Time Finish out For Floors 1-30, and New Parking Garage (557,099 SF)
Construction of new convenience store with a kitchen, a new car wash, a new gas pump canopy, and a new trash enclosure.
Interior Remodel to Existing Restaurant and Addition of a 2 Story Patio (4,420 SF)
BAUS Review- Addition of 3- Pre-Manufactured/Modular Power Distribution Centers to House Medium Voltage Electrical Equipment (2,858 SF)
Interior Remodel to Existing Retail Space (Wrangler's) (6,865 SF)
[APPROVED New Construction of Behavior Health Hospital located at the Texas Neuro Rehab Center Campus (46219 SF).
2026/08/15 | (2026/08/14) | Road to Lonestar Le Mans - Free community event showcasing edurance Le Mans racing prior to the race at COTA on 9/6. Majority of all of our event displays are inside Branch Park Pavilion but we would also like to add an outdoor LED…
QT - SELECTIVE EXTERIOR RENOVATION: MINOR FACADE REPAIRS PAINTING NEW SIGNAGE (UNDER SEPERATE PERMIT) SITE IMPROVEMENTS: CURBS AND PARKING AREAS MINOR REPAIR AND PATCHING. INSTALLATION OF NEW BOLLARDS AND RE-SLEEVING EXISTING BOLLARDS SEALCOAT AND RESTRIPING…
Repairing storefront like for like
Tenant office build-out to shell warehouse building. Includes racking per the occupancy classification letter. Engineered racking plans will be submitted as a deferred submittal. Access control requested. (Application 1). Exterior improvements fence generator…
+38 more plan review cases in the full issue
+50 more issued permits in the full issue
How fit is scored for glazing and storefront work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit glazing wording (storefront, curtain wall, glazing, windows, facade). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Jul 27–Aug 2, 2026.
Start Your Free Trial9 commercial projects in city plan review and 9 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 8 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Construction of new convenience store with a kitchen, a new car wash, a new gas pump canopy, and a new trash enclosure.
Change of use and interior remodeling for 2,550 SF restaurant
Vent hood installation + adding gas equipment into the kitchen
Simple Re-Roof. Existing retail
Simple Re-Roof. Existing office
Minor interior remodel of an existing building to allow child day care occupancy.
Upgrade Ice machine.
TPO Re-roof
TPO Re-roof
7 DAY - Replace existing kiosk with new one in mall - OVA
+4 more plan review cases in the full issue
+4 more issued permits in the full issue
How fit is scored for glazing and storefront work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit glazing wording (storefront, curtain wall, glazing, windows, facade). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Jul 31, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Glazing / Storefront) |
|---|---|---|---|---|---|
| Plan Review | Convenience store with car wash | New | $400K | Ermen LLC | Medium |
| Plan Review | Change of use to restaurant | Remodel | $1M est. (TDLR filing) | N/A | Low |
| Plan Review | Commercial remodel | Remodel | $300K est. (TDLR filing) | N/A | Low |
| Plan Review | Retail space remodel | Remodel | N/A | N/A | Low |
| Plan Review | Office space remodel | Remodel | N/A | N/A | Low |
| Issued Permit | Commercial remodel | Remodel | N/A | N/A | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.