1. 30-story multifamily shell with garage
New Construction of Shell for Multi-Family Building, First Time Finish out For Floors 1-30, and New Parking Garage (557,099 SF)
From Monday, Jul 27 through Sunday, Aug 2, 2026, 43 commercial projects entered or moved through City of Austin plan review and 55 commercial building permits were issued. 8 plan review cases and 4 issued permits rate Strong or Medium for Concrete / Foundation work.
This archived issue is ranked for Concrete / Foundation work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Jul 31.
43 commercial projects in city plan review and 55 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 43 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
New Construction of Shell for Multi-Family Building, First Time Finish out For Floors 1-30, and New Parking Garage (557,099 SF)
Construction of new convenience store with a kitchen, a new car wash, a new gas pump canopy, and a new trash enclosure.
Remove and replace existing tea and fountain equipment and cooler. Existing CO2 to remain. There are no modifications to exterior walls, parking, sidewalks, or landscape
SMALL PROJECT - Provide a 3/4" EMT from the boiler room to the ground floor parking garage and provide two junction boxes with #6 THHN CU for a 60-amp circuit. Charging…
Remove and replace existing tea and fountain equipment and chiller. Existing CO2 to remain. There are no modifications to exterior walls, parking, sidewalks or landscape
[APPROVED New Construction of Behavior Health Hospital located at the Texas Neuro Rehab Center Campus (46219 SF).
Tenant office build-out to shell warehouse building. Includes racking per the occupancy classification letter. Engineered racking plans will be submitted as a deferred submittal. Access control requested. (Application 1). Exterior improvements fence generator…
Install Steel Supports in Parking Garage at the lower level ramp drive lane.
Existing restaurant. Restore existing wood deck update ADA access to building install new ADA ramps stairs handrails and guards. Demolish existing asphalt and replace with top soil for seating area new wood deck with floating surface supports. New 24…
2026/08/15 | (2026/08/14) | Road to Lonestar Le Mans - Free community event showcasing edurance Le Mans racing prior to the race at COTA on 9/6. Majority of all of our event displays are inside Branch Park Pavilion but we would also like to add an outdoor LED…
+38 more plan review cases in the full issue
+50 more issued permits in the full issue
How fit is scored for concrete and foundation work: points for size (square feet), scope (new buildings, shells and additions score highest, site and paving work next, interior remodels lowest) and explicit concrete wording (foundation, slab, piers, tilt-wall, post-tension, paving, parking garage, sidewalks, retaining walls, site work). Strong needs a new building, shell or addition of 10,000+ SF or explicit concrete scope; interior finish-outs rate Low; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Jul 27–Aug 2, 2026.
Start Your Free Trial9 commercial projects in city plan review and 9 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 8 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Construction of new convenience store with a kitchen, a new car wash, a new gas pump canopy, and a new trash enclosure.
SMALL PROJECT - Installation of 6 EV Chargers (3 Dual-Ports) in parking garage at existing multifamily residential property
Foundation repair installation of pilings. Existing multifamily
Foundation repair. Installation of pilings. Existing multifamily
Change of use and interior remodeling for 2,550 SF restaurant
Minor interior remodel of an existing building to allow child day care occupancy.
Upgrade Ice machine.
TPO Re-roof
TPO Re-roof
7 DAY - Replace existing kiosk with new one in mall - OVA
+4 more plan review cases in the full issue
+4 more issued permits in the full issue
How fit is scored for concrete and foundation work: points for size (square feet), scope (new buildings, shells and additions score highest, site and paving work next, interior remodels lowest) and explicit concrete wording (foundation, slab, piers, tilt-wall, post-tension, paving, parking garage, sidewalks, retaining walls, site work). Strong needs a new building, shell or addition of 10,000+ SF or explicit concrete scope; interior finish-outs rate Low; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Jul 31, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Concrete / Foundation) |
|---|---|---|---|---|---|
| Plan Review | Convenience store with car wash | New | $400K | Ermen LLC | Medium |
| Plan Review | Apartment building remodel with garage | Remodel | $350K est. (TDLR filing) | Smart Charge Residential LLC | Medium |
| Plan Review | Apartment building remodel | Remodel | N/A | N/A | Low |
| Plan Review | Apartment building remodel | Remodel | N/A | N/A | Low |
| Plan Review | Change of use to restaurant | Remodel | $1M est. (TDLR filing) | N/A | Low |
| Issued Permit | Commercial remodel | Remodel | N/A | N/A | Low |