1. Restaurant remodel
Interior remodel of existing country club to add new bar. No grease trap, GIIVR included. No access control
Permit expediter: Waterloo512
From Monday, Feb 23 through Sunday, Mar 1, 2026, 42 commercial projects entered or moved through City of Austin plan review and 55 commercial building permits were issued. 6 plan review cases and 3 issued permits rate Strong or Medium for Kitchen Equipment work.
This archived issue is ranked for Kitchen Equipment work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Feb 27.
42 commercial projects in city plan review and 55 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 40 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior remodel of existing country club to add new bar. No grease trap, GIIVR included. No access control
Change of use from Mercantile (food sales) to Restaurant. - Health App
Amenity center is adding a kitchen sink, disposal, lift station, electric oven, ice machine, refrigerator, power to each unit, and cabinets
First time finish out for coffee shop
Interior only renovation of existing 1078 sf coffee shop
Change of Use from Office to Restaurant General.
(2nd Generation Space): Interior Tenant build-out of a new Killer Burger restaurant in an existing building. Work includes: New non-load bearing partition walls new interior finishes throughout space modifications to electrical service devices and low voltage…
Addition of Prefabricated Smokehouse to existing BBQ Restaurant 2025 103004 DA - Approved
The hood and ducts installation with electrical connection the stove and the fryer connection to the main natural gas line.
QT Simple re-roof/overlay
+37 more plan review cases in the full issue
+50 more issued permits in the full issue
How fit is scored for kitchen and food-service equipment work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit food-service wording (kitchen, restaurant, cafe, bar, hood, walk-in cooler). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Feb 23–Mar 1, 2026.
Start Your Free Trial12 commercial projects in city plan review and 5 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 4 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
First time finish out for coffee shop
Interior only renovation of existing 1078 sf coffee shop
First time finish out of an existing tenant space in shell building, corridor and demising wall. No change of use. No access control
Install (16) antennas and (16) RRUs for to rooftop. Install 8'x8' equipment platform to hold cabinet
7 DAY - Demo end of life UPS systems and replace with new like and kind UPS. no exterior or site work. Existing business building. - OVA
The hood and ducts installation with electrical connection the stove and the fryer connection to the main natural gas line.
Interior finish-out of first-generation spec (suite 600)
Construction of a new single floor 34782 S.F. Fitness Center
2026/03/15 |One evening only- private invite only event in our art gallery & outdoor space. RSVP only invite will be sent out to a select group of clients friends family art collectors staff members. No general admission. The event will run from 4-8pm. Free…
Tenant Improvement: Interior Modifications to the Front of House Retail Area and Partial Reconfiguration of House Area. While Leaving the Existing Employee Only Restroom Unchanged. AESOP Domain-Suite 100
+7 more plan review cases in the full issue
How fit is scored for kitchen and food-service equipment work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit food-service wording (kitchen, restaurant, cafe, bar, hood, walk-in cooler). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Feb 27, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Kitchen Equipment) |
|---|---|---|---|---|---|
| Plan Review | Retail space remodel | Remodel | N/A | Sage Crossroads, LLC | Medium |
| Plan Review | Retail space remodel | Remodel | $250K est. (TDLR filing) | N/A | Medium |
| Plan Review | Commercial remodel | Remodel | $1.6M est. (TDLR filing) | 7TH & SAN Marcos LLC | Low |
| Plan Review | Telecom site remodel | Remodel | N/A | Domain MN Owner LP | Low |
| Plan Review | Commercial remodel | Remodel | $2M est. (TDLR filing) | Crushing Terrell | Low |
| Issued Permit | Commercial remodel | Remodel | N/A | Art Village LLC | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.