1. Change of use to business tutoring center
Interior Remodel and Change of use from Business Admin Office to Business Tutoring Center. (69,035 SF)
Permit expediter: Waterloo512
From Monday, Feb 23 through Sunday, Mar 1, 2026, 42 commercial projects entered or moved through City of Austin plan review and 55 commercial building permits were issued. 6 plan review cases and 11 issued permits rate Strong or Medium for Doors & Hardware work.
This archived issue is ranked for Doors & Hardware work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Feb 27.
42 commercial projects in city plan review and 55 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 40 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior Remodel and Change of use from Business Admin Office to Business Tutoring Center. (69,035 SF)
Interior demolition of existing gun shop. Demolition of second level and exterior storefront will require permanent structural shoring, included in this permit
Interior Finish out of administrative office, includes new walls and doors, millwork, plumbing and electrical, reconfigure HVAC for new walls - Unit 304
ePlan Review: Remodel of Existing Light Manufacturing Building with New Dock Doors and Ramps - Concurrent Reviews
Reconstruct 6 feet of one compromised garage wall to include one entry door. Will install new drywall and tape/float
Interior Remodel for Existing Office - Suite 300
Interior alteration of an existing office space at bldg F.
Construction of a new single floor 34782 S.F. Fitness Center
Interior finish-out of first-generation spec (suite 600)
Interior Remodel to Existing Research Services and Light Manufacturing Phase 1 (11535 SF).
+37 more plan review cases in the full issue
+50 more issued permits in the full issue
How fit is scored for doors and hardware work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit door wording (doors, hardware, openings, frames, egress). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Feb 23–Mar 1, 2026.
Start Your Free Trial12 commercial projects in city plan review and 5 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 4 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior Finish out of administrative office, includes new walls and doors, millwork, plumbing and electrical, reconfigure HVAC for new walls - Unit 304
First time finish out of an existing tenant space in shell building, corridor and demising wall. No change of use. No access control
First time finish out for coffee shop
First time finish out of an existing tenant space in shell building. No change of use. No access control. Shell Building PR#2021-098510
Interior only renovation of existing 1078 sf coffee shop
Construction of a new single floor 34782 S.F. Fitness Center
Interior finish-out of first-generation spec (suite 600)
2026/03/15 |One evening only- private invite only event in our art gallery & outdoor space. RSVP only invite will be sent out to a select group of clients friends family art collectors staff members. No general admission. The event will run from 4-8pm. Free…
Tenant Improvement: Interior Modifications to the Front of House Retail Area and Partial Reconfiguration of House Area. While Leaving the Existing Employee Only Restroom Unchanged. AESOP Domain-Suite 100
The hood and ducts installation with electrical connection the stove and the fryer connection to the main natural gas line.
+7 more plan review cases in the full issue
How fit is scored for doors and hardware work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit door wording (doors, hardware, openings, frames, egress). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Feb 27, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Doors & Hardware) |
|---|---|---|---|---|---|
| Plan Review | Office space remodel | Remodel | $572K est. (TDLR filing) | Jdai Studio | Medium |
| Plan Review | Commercial remodel | Remodel | $1.6M est. (TDLR filing) | 7TH & SAN Marcos LLC | Low |
| Plan Review | Retail space remodel | Remodel | N/A | Sage Crossroads, LLC | Low |
| Plan Review | Commercial remodel | Remodel | $1.6M est. (TDLR filing) | 7TH & SAN Marcos LLC | Low |
| Plan Review | Retail space remodel | Remodel | $250K est. (TDLR filing) | N/A | Low |
| Issued Permit | Fitness center | New | $6.0M | C.E. Gleeson Constructors, Inc | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.