1. 3-story apartment building with garage
New construction of 3 story apartment building with 9 units and a parking garage
Permit expediter: Mercury Permits Inc
From Monday, Jan 19 through Sunday, Jan 25, 2026, 32 commercial projects entered or moved through City of Austin plan review and 26 commercial building permits were issued. 1 plan review case and 0 issued permits rate Strong or Medium for Elevator work.
This archived issue is ranked for Elevator work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Jan 23.
32 commercial projects in city plan review and 26 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 16 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
New construction of 3 story apartment building with 9 units and a parking garage
Upgrade Elec Service at existing commercial building
Remodel/TI to add two cooler doors, concrete pads outside the doors, and modify existing fence to include new door. Remodel/TI of the existing Driver's Check In Room and…
Foundation Repair Install 38 Steel Piers Fitness Center
7 DAY - Adding x-ray machine to existing medical office - OVA
ePlan Review: New construction of 30 story hotel Shell with basement and mech penthouse and restaurant (36 applications)
First Time Finish out from Warehouse Shell to Office Warehouse (41770 SF)
Interior Remodel to Existing Admin Office Areas on Floor 1. Phase1-C. Interior Remodel to Existing Admin Office Areas. Phase9-A. Phase9-B. Phase17-C. Phase9-C. Phase10-A. Phase10-B. Phase10-C. Phase11-A. Phase11-B. Phase11-C. Phase12-A. Phase12-B. Phase13-A.…
ePlan: BAUS - Airport Project: 2D and 3D Art Installation Inside and Extending out of the Three Skylights over the Atrium Infill Area. The Artwork will Include Sculptural Bird Sculptural Floral Soundwaves and Mural Components (7000 SF).
Interior remodel of existing office space dividing full floor into new spec suite 200
+27 more plan review cases in the full issue
+21 more issued permits in the full issue
How fit is scored for elevator work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit elevator wording (elevator, lift, escalator). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Jan 19–25, 2026.
Start Your Free Trial10 commercial projects in city plan review and 9 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 7 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior remodel to existing business office suite. No access control
Tenant remodel Expansion for Cat Hospital HVAC - Replacement and slight location change of register grilles only. This is exempt from Mechanical permit
Interior alteration to remove social/communicating stair in an existing office space on levels 9-12 (7 Day Application)
First-time Tenant Finish Out to create restaurant.
Replace existing rotten fascia and soffit around the exterior perimeter of building and remove rotten decorative corbels
Interior Remodel to Existing Admin Office Areas on Floor 1. Phase1-C. Interior Remodel to Existing Admin Office Areas. Phase9-A. Phase9-B. Phase17-C. Phase9-C. Phase10-A. Phase10-B. Phase10-C. Phase11-A. Phase11-B. Phase11-C. Phase12-A. Phase12-B. Phase13-A.…
INTERIOR REMODEL OF EXISTING OFFICE SPACE.
Remodel of existing restaurant finish out
Installing 90.2 kW Solar System with 164 ALEX-550-W panels 1 SCA50KTL-DO and 1 SCA25KTL-DO Inverters.
New pool ONLY. All other work by others.
+5 more plan review cases in the full issue
+4 more issued permits in the full issue
How fit is scored for elevator work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit elevator wording (elevator, lift, escalator). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Jan 23, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Elevator) |
|---|---|---|---|---|---|
| Plan Review | Office space remodel | Remodel | N/A | N/A | Low |
| Plan Review | Hospital remodel | Remodel | N/A | MedTech Construction | Low |
| Plan Review | Office space remodel | Remodel | $3M est. (TDLR filing) | Cshv-300 West 6TH Street LLC | Low |
| Plan Review | Restaurant remodel | Remodel | $950K est. (TDLR filing) | Tedrow Design Group | Low |
| Plan Review | Commercial remodel | Remodel | N/A | Community Housing Expansion of Austin | Low |
| Issued Permit | Office space remodel | Remodel | $50K est. (TDLR filing) | Structure Tone | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.