1. Admin Office Finish-Out
First Time Finish Out to Admin Office on levels 25 (30,090 SF) and 26 (29,903 SF) with new opening and connecting stair between levels (59,993 SF total)
No company contact in the City data beyond the permit expediter.
Every issue ranks the City of Austin's new plan review cases and issued permits by fit for your trade, best fits first. Weekly Digest: every Monday. Daily Recap: each weekday, plus a full spreadsheet.
This page shows the sample ranked for Doors & Hardware work only: Doors & Hardware fit labels and scores, best fits first. Pick Doors & Hardware at signup and every issue is ranked this way.
104 commercial projects in city plan review and 41 newly issued commercial building permits last week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 29 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
First Time Finish Out to Admin Office on levels 25 (30,090 SF) and 26 (29,903 SF) with new opening and connecting stair between levels (59,993 SF total)
New Construction of Shell- Scope of Work to Include Multi Family Res. Shell and Tenant Finish out 1st Floor Multifamily and Amenity
New Construction of Apartment Complex (58,777 SF)
Remodel of existing building and New construction addition to create a Mixed Use MF building. 102,878 SF of R occupancy among 27 dwelling units; with accessory uses of…
Multi-family apartment building, 5 floors, 39 total dwelling units with common amenities and office/leasing area. On-site surface parking, walkways, and…
Interior Remodel and Change of Use from Retail to Indoor Recreation Center (33878 SF).
CHANGE OF USE OF EXISTING METAL WAREHOUSE BUILDING TO INDOOR SPORTS AND RECREATION INCLUDING NEW MEZZANINE ASSOCIATED MEP AND FIRE PROTECTION.
Proposed new 7381 SF AutoZone retail store for auto parts and products.
First time finish out to create Spec Suite.
Finish Out to Create Office for Suite 1301
+99 more plan review cases in the full issue
+36 more issued permits in the full issue
How fit is scored for doors and hardware work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit door wording (doors, hardware, openings, frames, egress). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Nov 16–22, 2026.
Start Your Free Trial43 commercial projects in city plan review and 7 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 6 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Remodel of existing building and New construction addition to create a Mixed Use MF building. 102,878 SF of R occupancy among 27 dwelling units; with accessory uses of…
New Construction of Shell for Multi-Family Building, First Time Finish out For Floors 1-30, and New Parking Garage (557,099 SF)
Finish out for door and window showroom and warehouse. Existing shell space
Interior remodel and demise to two flex office / warehouse suites. New overhead door and insulation (App 1 - Suite 100). Restroom interior remodel (App 2 - Suite 100).…
New C60 UV Disinfection & Parshall Flume Building at Walnut Creek WWTP. IBC Construction Type IIA; 7461 Square Feet; Occupancy F-1; 1 Story with internal bridge
CHANGE OF USE OF EXISTING METAL WAREHOUSE BUILDING TO INDOOR SPORTS AND RECREATION INCLUDING NEW MEZZANINE ASSOCIATED MEP AND FIRE PROTECTION.
Interior remodel of existing office space for offices with associated MEP.
AISD proposed 120 monopole tower and ground equipment. No backup batteries or generator proposed.
foundation repair. installing 20 interior pilings.
REROOF
+38 more plan review cases in the full issue
+2 more issued permits in the full issue
How fit is scored for doors and hardware work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit door wording (doors, hardware, openings, frames, egress). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Nov 20, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Doors & Hardware) |
|---|---|---|---|---|---|
| Plan Review | 10-Story Apartment Building | New | N/A | Thrower Design | Strong |
| Plan Review | 30-Story Multifamily Shell with Garage | Shell | $129.0M | Rogers-O'Brien Construction Co. LTD | Medium |
| Plan Review | Warehouse Remodel | Remodel | N/A | JM Assets, L.P. | Medium |
| Plan Review | Warehouse Remodel | Remodel | $499K est. (TDLR filing) | Holder + Southwick Architects | Medium |
| Plan Review | Industrial Building, Walnut Creek WWTP | New | $500K | Civil Team Engineers | Medium |
| Issued Permit | Change of Use to Indoor Sports | Addition and Remodel | $2.3M | Miars Construction | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.