1. Apartment complex
New Construction of Apartment Complex (58,777 SF)
Permit expediter: Mercury Permits Inc
From Monday, Oct 5 through Sunday, Oct 11, 2026, 56 commercial projects entered or moved through City of Austin plan review and 48 commercial building permits were issued. 10 plan review cases and 13 issued permits rate Strong or Medium for Doors & Hardware work.
This archived issue is ranked for Doors & Hardware work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Oct 9.
56 commercial projects in city plan review and 48 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 42 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
New Construction of Apartment Complex (58,777 SF)
BAUS Review- Interior Remodel Break Area Will Be Subdivided into Two Separate Areas, Scope of Work to Include New Partial Height Partitions and Entry Door
Expedited Review *SMART HOUSING* New Construction of a 7-Story Multi-Family Shell Bldg. with Parking Garage and Finish-Outs for each level (106,335 SF)
New Construction of a 140' auto wash tunnel, Construction of a 1,732 SF canopy, Construction of a 858 SF canopy, Construction of a 2,111 SF canopy, and Construction of a…
Interior demolition of existing 4,400 SF restaurant and bar to a cold dark shell: non-load bearing partitions, finishes, casework, bar, bandstand, non-original…
Interior Remodel to Existing Garage Space. Scope of work includes removal of exterior windows for new garage doors with metal ramps annd stairs. New Fire rated wall around the entire Space (486360 SF).
Repair of existing exterior stair to make code compliant and provide a second means of egress for future second floor tenant
Interior remodel to existing admin areas
Interior remodel of flex office space
Centerstore remodel to replace some existing gondola shelving with multi-deck dairy refrigeration display cases. These are not intended to create building separations nor are they expected to impede building egress.
+51 more plan review cases in the full issue
+43 more issued permits in the full issue
How fit is scored for doors and hardware work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit door wording (doors, hardware, openings, frames, egress). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Oct 5–11, 2026.
Start Your Free Trial9 commercial projects in city plan review and 4 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 4 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Demo, new walls, doors, ceiling and millwork and MEP
Repair water-damaged balconies, breezeways and corridors; selective demolition, framing/subfloor and concrete repairs, waterproofing/flashing, door thresholds,…
ePlan Review: Remodel to Office Suite - Existing 12,388 SF remodel area 10,478 SF
BAUS Review- Addition of 3- Pre-Manufactured/Modular Power Distribution Centers to House Medium Voltage Electrical Equipment (2,858 SF)
Interior finish out of a first generation office space
Interior Remodel to Existing Garage Space. Scope of work includes removal of exterior windows for new garage doors with metal ramps annd stairs. New Fire rated wall around the entire Space (486360 SF).
Centerstore remodel to replace some existing gondola shelving with multi-deck dairy refrigeration display cases. These are not intended to create building separations nor are they expected to impede building egress.
Interior remodel of existing office space. No change of use. No access control.
Finish out of existing warehouse / office.
+4 more plan review cases in the full issue
How fit is scored for doors and hardware work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit door wording (doors, hardware, openings, frames, egress). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Oct 9, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Doors & Hardware) |
|---|---|---|---|---|---|
| Plan Review | Commercial remodel | Remodel | N/A | N/A | Medium |
| Plan Review | Commercial remodel | Remodel | N/A | Reconstruction Experts, Inc | Medium |
| Plan Review | Office space remodel | Remodel | $560K est. (TDLR filing) | N/A | Low |
| Plan Review | Addition and remodel, manufacturing plant | Addition and Remodel | $1.0M | HDR Engineering, Inc | Low |
| Plan Review | Office space remodel | Remodel | $780K est. (TDLR filing) | 3423 Holdings LLC | Low |
| Issued Permit | Commercial remodel | Remodel | $1.4M est. (TDLR filing) | The Boldt Company | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.