1. Retail space remodel
Scope includes providing new wall finishes, new lighting fixtures, new kitchen area and interior walls, storefronts for office use. Scope will include mechanical,…
From Monday, May 4 through Sunday, May 10, 2026, 51 commercial projects entered or moved through City of Austin plan review and 46 commercial building permits were issued. 4 plan review cases and 6 issued permits rate Strong or Medium for HVAC / Mechanical work.
This archived issue is ranked for HVAC / Mechanical work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, May 8.
51 commercial projects in city plan review and 46 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 35 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Scope includes providing new wall finishes, new lighting fixtures, new kitchen area and interior walls, storefronts for office use. Scope will include mechanical,…
Ground up construction of a quick serve restaurant with attached corral, outdoor patio seating area and drive thru lanes. Concurrent Review.
7 DAY - 2 APPS, BLDG 5 AND BLDG 6. Placement of portable with associated access stair and ramp. Location of portable will be the same as previously permitted in 2014.…
Interior Remodel to Existing Floor 1, Scope of work to also Additional New Exterior Equipment Enclosure (37,033 SF)
CHANGE OF USE MED OFFICE TO RETAIL with interior renovation of approx 3050 SF retail space, including new partitions, finishes, fixtures, and associated MEP modifications
ePlan: Expedited Review - New Shell Building of a 57-Story Mixed Use Multi-Family Bldg. with Parking Garage. Contains Lobby Offices Amenities Mail Breakroom Restrooms Dog Park Fitness and Co-Working (876109 SF). ePlan: Expedited Review - New Construction of…
7 DAY - FIRE AND WATER DAMAGE ON EXISTING APARTMENT UNIT 331. FIRE DAMAGED APARTMENT UNIT REPAIR TO CONSIST OF NEW FRAMING EXTERIOR REPAIR AND FINISHING TOUCHES AS NEEDED. EXTERIOR WORK IS INVOLVES HARDIE REPLACMENT. ALL NEW MECHANICAL EQUIPMENT ELECTRICAL…
QT - DEMO OF INTERIOR WALLS ONLY TO BRING UNIT BACK TO WHITE BOX CONDITIONS. NO CHANGE TO EXTERIOR WALLS OR EXISTING PLUMBING ELECTRIC OR MECHANICAL AT EXISTING OFFICE - OVA
7 DAY - Demo and replace chiller and chiller pumps - OVA
Proposed new amenity at the Sonora Condo community to include a pool bathrooms and an outdoor patio. The pool was approved separately 2025-157622 BP (2 APPS) **Rear entrance to enter neighborhood is from 10620 Macmora Road.
+46 more plan review cases in the full issue
+41 more issued permits in the full issue
How fit is scored for HVAC work: points for size (square feet), scope (new buildings, additions and finish-outs score highest, small remodels lowest), occupancy (labs, medical, hotels, restaurants, schools and assembly carry the most HVAC load) and explicit HVAC wording (RTU, chiller, ductwork, exhaust, VRF, AHU). Strong needs real size (12,000+ SF) or explicit HVAC scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of May 4–10, 2026.
Start Your Free Trial8 commercial projects in city plan review and 7 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 6 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
CHANGE OF USE MED OFFICE TO RETAIL with interior renovation of approx 3050 SF retail space, including new partitions, finishes, fixtures, and associated MEP modifications
Interior remodel existing hospital areas. Xray 5 (1st Floor)
Interior remodel existing hospital areas. CT-2 (1st Floor)
Interior renovation of an existing office, no change in occupancy or use
Interior remodel to existing warehouse B37 Restrooms
ePlan: Expedited Review - New Shell Building of a 57-Story Mixed Use Multi-Family Bldg. with Parking Garage. Contains Lobby Offices Amenities Mail Breakroom Restrooms Dog Park Fitness and Co-Working (876109 SF). ePlan: Expedited Review - New Construction of…
New Construction of Two-Story Shell for Future Showroom and Offices for Architectural Stone Products. Scope of Work includes 1st floor Showroom office and Mezzanine. (23163 SF) First Time Finish Out For 1st floor and Mezzanine - Showroom and Sales Office…
QT - Interior alteration of approx. 3497 sq ft of existing interior office space - OVA
Change exception from office to food outlet approved. No remodelling work is taking place.
Bathroom Remodel for an apartment unit.
+3 more plan review cases in the full issue
+2 more issued permits in the full issue
How fit is scored for HVAC work: points for size (square feet), scope (new buildings, additions and finish-outs score highest, small remodels lowest), occupancy (labs, medical, hotels, restaurants, schools and assembly carry the most HVAC load) and explicit HVAC wording (RTU, chiller, ductwork, exhaust, VRF, AHU). Strong needs real size (12,000+ SF) or explicit HVAC scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, May 8, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (HVAC / Mechanical) |
|---|---|---|---|---|---|
| Plan Review | Change of use to retail space | Remodel | $130K est. (TDLR filing) | N/A | Low |
| Plan Review | Hospital remodel | Remodel | $1M est. (TDLR filing) | N/A | Low |
| Plan Review | Hospital remodel | Remodel | $1M est. (TDLR filing) | N/A | Low |
| Plan Review | Office space remodel | Remodel | $450K est. (TDLR filing) | Designhaus Architecture | Low |
| Plan Review | Warehouse remodel | Remodel | N/A | N/A | Low |
| Issued Permit | 57-story fitness center shell with garage | Shell | $154.0M | Summit Design Build | Strong |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.