1. Change of use to retail space
CHANGE OF USE PERSONAL SERVICE to RETAIL and OFFICE Exterior remodel site improvements. planters, paving walkway, stairs, awning, regrading, enclosing existing stiar…
From Monday, Feb 16 through Sunday, Feb 22, 2026, 45 commercial projects entered or moved through City of Austin plan review and 36 commercial building permits were issued. 3 plan review cases and 6 issued permits rate Strong or Medium for Concrete / Foundation work.
This archived issue is ranked for Concrete / Foundation work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Feb 20.
45 commercial projects in city plan review and 36 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 23 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
CHANGE OF USE PERSONAL SERVICE to RETAIL and OFFICE Exterior remodel site improvements. planters, paving walkway, stairs, awning, regrading, enclosing existing stiar…
Installation of (12) Xeal 32 A EV Charging Stations, on (6) Dual Pedestals with Cable Management Inside Parking Garage of New Apartment Complex the Maris
New Construction of a 6261 sf Convenience Store, a 16 VFP fueling canopy, and 2 block/brick trash enclosures
7 DAY renovated garage, new roof and doors. drainage
Parker Flats - Foundation Repair - Installing 33 Exterior Pilings
New Shell Addition to Existing Hospital -5 Floors with Future Expansion of 3 Floors- Level 4 to Remain in Shell Condition for Future Finish Out (6) Applications Finish Out for Ground Floor - Building Services Staff Areas Decontam/Clean Assembly Areas…
ePlan Review: Addition and finish out of existing admin shell building. Scope includes interior fit out addition for equipment yard 9 transformer pads in fenced area and 6 EV chargers for Building D
New 5 story 104 unit affordable / supportive housing multi-family residential building with an integral clubhouse. SMART HOUSING
New Building Shell Construction for an Office Use Building.
ePlan Review: New O2 Park.
+40 more plan review cases in the full issue
+31 more issued permits in the full issue
How fit is scored for concrete and foundation work: points for size (square feet), scope (new buildings, shells and additions score highest, site and paving work next, interior remodels lowest) and explicit concrete wording (foundation, slab, piers, tilt-wall, post-tension, paving, parking garage, sidewalks, retaining walls, site work). Strong needs a new building, shell or addition of 10,000+ SF or explicit concrete scope; interior finish-outs rate Low; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Feb 16–22, 2026.
Start Your Free Trial21 commercial projects in city plan review and 7 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 4 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Replace very old cast iron wastewater drain/vent stack serving all units in this fourplex building, perform limited foundation leveling work and limited demolition work…
Completely remove existing historical tile, wood shingles, and spaced sheathing down to structure for existing sloped concrete tile roof. Clean and salvage historical…
Interior Remodel of DH4 Train Area To Include Installing an Electrical Room for Upgrading Capacity (14,996 SF)
Shingle Replacement
Shingle Replacement
ePlan Review: Addition and finish out of existing admin shell building. Scope includes interior fit out addition for equipment yard 9 transformer pads in fenced area and 6 EV chargers for Building D
ePlan Review: New O2 Park.
2026/02/21 - 2026/03/01 | 2026/01/27) | WTA 250 annual professional tennis tournament now in its fourth year at Westwood Country Club
structural repairs to balconies adding weep screens to stucco soffits and remove and replace 40x48 of front stone facade.
Exterior structural repair to landing at Bldg 7.
+16 more plan review cases in the full issue
+2 more issued permits in the full issue
How fit is scored for concrete and foundation work: points for size (square feet), scope (new buildings, shells and additions score highest, site and paving work next, interior remodels lowest) and explicit concrete wording (foundation, slab, piers, tilt-wall, post-tension, paving, parking garage, sidewalks, retaining walls, site work). Strong needs a new building, shell or addition of 10,000+ SF or explicit concrete scope; interior finish-outs rate Low; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Feb 20, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Concrete / Foundation) |
|---|---|---|---|---|---|
| Plan Review | Commercial remodel | Remodel | N/A | 1019 E Riverside Condo Assoc | Low |
| Plan Review | Commercial remodel | Remodel | N/A | Bridges Real Estate LLC | Low |
| Plan Review | Commercial remodel | Remodel | N/A | Jacobs Engineering | Low |
| Plan Review | Commercial remodel | Remodel | N/A | N/A | Low |
| Plan Review | Commercial remodel | Remodel | N/A | N/A | Low |
| Issued Permit | Office space remodel | Remodel | $75K est. (TDLR filing) | Rogers-O'Brien Construction | Strong |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.