1. Retail space remodel
Interior Remodel to include Tenante Improvements for Future Ross Dress For Less Retail Store (27,277 SF)
From Monday, Feb 2 through Sunday, Feb 8, 2026, 51 commercial projects entered or moved through City of Austin plan review and 46 commercial building permits were issued. 1 plan review case and 4 issued permits rate Strong or Medium for Low-Voltage / Security work.
This archived issue is ranked for Low-Voltage / Security work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Feb 6.
51 commercial projects in city plan review and 46 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 37 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior Remodel to include Tenante Improvements for Future Ross Dress For Less Retail Store (27,277 SF)
Interior Remodel for Core Improvements for Future Finish Out. Not For Occupancy (38,623 SF)
9667 SF Interior fit out for a non procedural facility. Scope includes the construction of new non load bearing partitions for new private offices, break room, waiting…
New construction of 3178 sf restaurant building with drive-thru and redevelopment of existing site
SMART HOUSING - New Construction of a multi-family fourplex
Tenant Finish out Office Space(2193024 SF)
Interior Tenant Improvement of Existing Retail Space for Building 1
Interior remodel to existing admin offices (suites 300 and 400 - 2 apps) Interior remodel to existing admin offices (suites 300 and 400 - 2 apps)
Finish Out for Admin Office
ePlan Review: Interior Remodel to existing warehouse and distribution center
+46 more plan review cases in the full issue
+41 more issued permits in the full issue
How fit is scored for low-voltage and security work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (offices, labs, medical and hotels carry the most low-voltage) and explicit low-voltage, access control or cabling wording. Strong needs real size or explicit scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Feb 2–8, 2026.
Start Your Free Trial8 commercial projects in city plan review and 5 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 5 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
9667 SF Interior fit out for a non procedural facility. Scope includes the construction of new non load bearing partitions for new private offices, break room, waiting…
Interior remodel of existing office space. No Access Control
Interior finish out (Building 21)
Interior commercial kitchen remodel. Scope includes replacement of one 1 existing 4 foot Type I exhaust hood, addition of two 2 new 10 foot Type I exhaust hoods,…
Building an attached pergola like to like after removing current pergola structure on a quadplex
Interior remodel to existing admin offices (suites 300 and 400 - 2 apps) Interior remodel to existing admin offices (suites 300 and 400 - 2 apps)
Interior finish-out for convenience store. First tenant in space.
Structural repairs for Buildings 6 and 8.
Structural Balcony Repairs (3 apps - Suites 238 262 and 264) Structural Balcony Repairs (3 apps - Suites 238 262 and 264) Structural Balcony Repairs (3 apps - Suites 238 262 and 264)
TEMPORARY BUILDING PERMIT scope of permit is limited to under slab utilities and foundation structural including piers and beams footings and concrete pour for building electrical and plumbing
+3 more plan review cases in the full issue
How fit is scored for low-voltage and security work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (offices, labs, medical and hotels carry the most low-voltage) and explicit low-voltage, access control or cabling wording. Strong needs real size or explicit scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Feb 6, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Low-Voltage / Security) |
|---|---|---|---|---|---|
| Plan Review | Office space remodel | Remodel | $821K est. (TDLR filing) | N/A | Low |
| Plan Review | Office space remodel | Remodel | N/A | S. Tipton Studio | Low |
| Plan Review | Commercial remodel | Remodel | $1.3M est. (TDLR filing) | Cobb, Fendley & Associates, Inc | Low |
| Plan Review | Commercial remodel | Remodel | N/A | N/A | Low |
| Plan Review | Commercial remodel | Remodel | N/A | Ace Remodeling TX | Low |
| Issued Permit | Office space remodel | Remodel | $1.5M est. (TDLR filing) | Harvey-Cleary Builders | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.