1. Commercial remodel
Remodel existing semiconductor production facility to install new equipment for a permanent swing tank within a new containment area connected to the original FAB1 FWW…
Permit expediter: Austin Permit Service, Inc
From Monday, Jan 12 through Sunday, Jan 18, 2026, 31 commercial projects entered or moved through City of Austin plan review and 39 commercial building permits were issued. 1 plan review case and 1 issued permit rate Strong or Medium for Fire Sprinkler / Alarm work.
This archived issue is ranked for Fire Sprinkler / Alarm work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Jan 16.
31 commercial projects in city plan review and 39 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 27 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Remodel existing semiconductor production facility to install new equipment for a permanent swing tank within a new containment area connected to the original FAB1 FWW…
Non-Structural interior remodel of 3,330 SF reception and common space on Level 1 of an existing fully sprinklered
New construction of 2 restaurant SHELL buildings (NOT FOR OCCUPANCY) and 2 dumpster enclosures. Bldg. 1 and Bldg. 2 (4 Apps) Concurrent Review, total demo of existing…
Stucco Repairs, Framing Repairs to Existing Multi Family Residential
First time tenant fit out for a restaurant
ePlan: Expedited Review - New Construction of 7 4-Story Multi-Family Bldg. (425647 SF). ePlan: Expedited Review - New Construction of 7 4-Story Multi-Family Bldg (425647 SF). ePlan: Expedited Review - New Construction of Pool Cabana for Multi-Family Bldg.…
Finish Out for Admin Office for Suite 200
Structural Only - Floor Framing is being reinforced for new loading conditions. (Floor 3 Sector 142) Structural Only - Floor Framing is being reinforced for new loading conditions. (Sector 143 Floor 2&3 146 Floor 3 147 Floor 3).
Interior Remodel to Existing Admin Office Areas. Phase15-A.
Remodel existing admin office building to create sprinkler riser room.
+26 more plan review cases in the full issue
+34 more issued permits in the full issue
How fit is scored for fire sprinkler and alarm work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (hotels, apartments, schools, medical and assembly need sprinklers and alarm) and explicit sprinkler or alarm wording. Strong needs real size (20,000+ SF) or explicit scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Jan 12–18, 2026.
Start Your Free Trial6 commercial projects in city plan review and 7 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 5 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Change of Use from Retail to Personal Services (4,066SF)
7 DAY - Amnesty CO - OVA
Multi-Purpose Wellness Community Center #1 & #2, and Dining Area. FR ref
QT - Retaining wall - OVA
Interior remodel to existing office PR 2025 123948 / BP 2025 133362 will be withdrawn once this BP is issued as the PR above is a QT and can't be revised but it has…
Interior Tenant Alteration of 5 Existing Spaces to Upfit New Tenant UNIQLO
Change of use from Retail to Restaurant.
7 DAY Remodel existing admin office
BAUS: GSE Renovation - New Triturator Wash Bay.
Finish Out for Market - 12th Floor
+1 more plan review case in the full issue
+2 more issued permits in the full issue
How fit is scored for fire sprinkler and alarm work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (hotels, apartments, schools, medical and assembly need sprinklers and alarm) and explicit sprinkler or alarm wording. Strong needs real size (20,000+ SF) or explicit scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Jan 16, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Fire Sprinkler / Alarm) |
|---|---|---|---|---|---|
| Plan Review | Change of use to personal services | Remodel | $800K est. (TDLR filing) | Urban Building Services of Texas | Low |
| Plan Review | Commercial remodel | Remodel | N/A | MarinaBioLab | Low |
| Plan Review | Commercial remodel | Remodel | N/A | Casa de Luz Village | Low |
| Plan Review | Commercial remodel | Remodel | $3M est. (TDLR filing) | CMC Brodie Ltd | Low |
| Plan Review | Office space remodel | Remodel | N/A | Pgal | Low |
| Issued Permit | Commercial remodel | Remodel | $180K est. (TDLR filing) | Gray West Construction | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.